Project Size
Project Size
Landfill Lüntenbeck Wuppertal
Landfill capping with CARBOFOL® PEHD 507/508 according to BAM guidelines and installation of drainage layers.
Building owner: AWG -Abfallwirtschaftsgesellschaft
Construction: Heinrich-Walter Bau, Borken
External supervision: S.I.G—Dr.-Ing. Steffen 
approx.
58,000 m²
Central landfill Hünxe—Wandabdichtung Sondermüllkassette
Basic waterproofing with CARBOFOL® PEHD 508 according to BAM guidelines and installation of a non-woven protective fabric.
Building owner: AGR (Abfallbeseitigunggesellschaft-Ruhrgebiet)
Construction: Heilit—Umwelttechnik, Düsseldorf
External supervision: Limes Gesellschaft mbH, Inspektion+Materialprüfung
approx.
1.600 m²
Landfill Eggingen, section 2007
Landfill capping with AGRU liners according to BAM guidelines as well as Bentonit and installation of protective membranes.
Building owner: EBU Entsorgungsbetriebe der Stadt Ulm
Construction: Ecosoil Süd GmbH, Ulm
External supervision: Geoplan GmbH, Neukirchen-Vluyn
approx.
54,000 m²
Landfill Dänkritz (2006 + 2007)
Landfill capping with AGRU liners according to BAM guidelines and installation of drainage layers.
Building owner: Zweckverband Abfallwirtschaft Zwickau
Construction: Strabag AG, Bereich Erd u. Deponiebau Penig, Sachsen
External supervision: DBI-EWI GmbH
approx.
160,000 m²
Landfill Dortmund-Nordost, contract section 15.3, part 2007
Basic waterproofing with AGRU liners according to BAM guidelines
Building owner: EDG, Entsorgung Dortmund GmbH
Construction: DBR, Dortmund
External supervision: Geotechnisches Büro Prof. Dr. Düllmann
approx.
15,000 m²
Central landfill Emscherbruch, S—area 2nd construction stage – Landfill capping
Landfill capping with CARBOFOL® PEHD 507 according to BAM guidelines and installation of a non-woven protective fabric.
Building owner: AGR (Abfallbeseitigunggesellschaft-Ruhrgebiet)
Construction: Arge bds/HUT
External supervision: Limes Gesellschaft mbH, Inspektion+Materialprüfung
approx.
29,000 m²
Landfill Fohrde
Landfill capping with AGRU liners according to BAM guidelines and installation of drainage layers.
Building owner: City of Brandenburg an der Havel
Construction: Hermann Kirchner Bauunternehmung
External supervision: GGU Gesellschaft für Grundbau und Umwelttechnik
approx.
63,500 m²
Landfill Lumpicht
Landfill capping with CARBOFOL® PEHD 507 according to BAM guidelines and installation of a non-woven protective fabric.
Building owner: Zweckverband Abfallwirtschaft Zwickau
Construction: Strabag AG, Bereich Erd u. Deponiebau Penig, Sachsen
External supervision: DBI-EWI GmbH
approx.
60,000 m²
Landfill Friedelsheim
Landfill capping with CARBOFOL® PEHD 507 according to BAM guidelines and installation of drainage layers.
Building owner: Abfallwirtschaft Landkreis Bad Dürkheim
Construction: Heilit Umwelttechnik, Darmstadt
External supervision: Geotechnisches Büro Prof. Dr. Düllmann
approx.
6,000 m²

Landfills 2006

Project Size
Project Size
Landfill Dortmund-Nordost, construction stage 15.3, 2006
Basic waterproofing with AGRU liners according to BAM guidelines and installation of a non-woven protective fabric.
Building owner: EDG, Entsorgung Dortmund GmbH
Construction: DBR, Dortmund
External supervision: Geotechnisches Büro Prof. Dr. Düllmann
approx. 15,000 m² 
EZ Gutenfurt/Ravensburg A III
Basic waterproofing with AGRU liners according to BAM guidelines and installation of a non-woven protective fabric.
Building owner: Landkreis Ravensburg
Construction: Ecosoil Süd GmbH, Ulm
External supervision: Geoplan GmbH, Neukirchen-Vluyn
approx. 8,500 m²

Central landfill Emscherbruch, H/S, 3.BA- Surface sealing
Landfill capping with CARBOFOL® PEHD 507 according to BAM guidelines and installation of a non-woven protective fabric.
Building owner: AGR (Abfallbeseitigunggesellschaft-Ruhrgebiet)
Construction: Arge bds/HUT
External supervision: Limes Gesellschaft mbH, Inspektion+Materialprüfung

approx. 11,000 m²
Central landfill Emscherbruch, SF 7/8-Bereich
Basic waterproofing with AGRU liners according to BAM guidelines and installation of a non-woven protective fabric.
Building owner: AGR ( Abfallbeseitigunggesellschaft-Ruhrgebiet )
Construction: Heitkamp Erd-und Strassenbau GmbH
External supervision: Limes Gesellschaft mbH, Inspektion+Materialprüfung
approx. 14,500 m²
Landfill Eggingen, Teilstück 2006
Surface sealing with AGRU liners according to BAM guidelines and installation of a non-woven protective fabric.
Building owner: EBU Entsorgungsbetriebe der Stadt Ulm
Construction: Ecosoil Süd GmbH, Ulm
External supervision: Geoplan GmbH, Neukirchen-Vluyn
approx. 69,000 m²
Landfill Friedländer Berg
Surface sealing with CARBOFOL® PEHD 507 according to BAM guidelines and installation of a non-woven protective fabric and drainage layers.
Building owner: Landkreis Oder-Spree
Construction: Aricon Straßen-, Tiefbau u. Abriss GmbH
External supervision: DBI-EWI GmbH
approx. 49,000 m²
Landfill Karlsbad/Ittersbach construction stage 2005/2006
Surface sealing mit CARBOFOL® PEHD 507 according to BAM guidelines and installation of a non-woven protective fabric and drainage layers.
Building owner: Abfallwirtschaftsbetrieb des Landkreises Karlsruhe
Construction: Walter-Heilit Verkehrswegebau
External supervision: Geoplan GmbH, Neukirchen-Vluyn
approx. 95,000 m²
Landfill Einöd, DK II, 1
Basic waterproofing with AGRU liners as well as a protection system approved by BAM: sand filled protective liners (MDDS liners sand mats)
Building owner: AWS Abfallwirtschaft Stuttgart
Construction: Ecosoil Süd
External supervision: MPA Stuttgart
approx. 20,000 m²
Landfill Neuendorf-Brück
Surface sealing mit CARBOFOL® PEHD 507 according to BAM guidelines and installation of drainage layers.
Building owner: Abfallwirtschaft Potsdam-Mittelmark GmbH
Construction: TS-Bau GmbH
External supervision: Limes Gesellschaft mbH, Inspektion+Materialprüfung
approx. 23,000 m²
Landfill Satte Klamm
Surface sealing with AGRU liners according to BAM guidelines.
Building owner: Stadt Offenburg
Construction: Heilit + Woerner Bau GmbH
External supervision: Geoplan GmbH, Neukirchen-Vluyn
approx. 75,000 m²

Landfills 2005

Project Size
Project Size
Environmental liabilities industrial park Hibernia
Surface sealing mit CARBOFOL® PEHD 507
Building owner: LEG Landesentwickelungsgesellschaft NRW
Construction:
Vestische Straßen- und Tiefbau GmbH, Datteln
External supervision: Geotechnisches Büro Prof. Dr. Düllmann 
approx. 24,000 m² 
EZ Gutenfurt/Ravensburg
Basic waterproofing with AGRU liners according to BAM guidelines
Building owner: Landkreis Ravensburg
Construction: Ecosoil Süd GmbH, Ulm
External supervision: Geoplan GmbH, Neukirchen-Vluyn
approx. 11,500 m²
Central landfill Emscherbruch, 4.BA- Surface sealing
Surface sealing mit CARBOFOL® PEHD 507, according to BAM guidelines
Building owner: AGR ( Abfallbeseitigunggesellschaft-Ruhrgebiet )
Construction: Arge bds/HUT
External supervision: Limes Gesellschaft mbH, Inspektion+Materialprüfung  
approx. 65,000 m²
Central landfill Emscherbruch, SF6-Bereich
Basic waterproofing with AGRU liners according to BAM guidelines and installation of a non-woven protective fabric
Building owner: AGR ( Abfallbeseitigunggesellschaft-Ruhrgebiet )
Construction: Heitkamp Erd-und Strassenbau GmbH
External supervision: Limes Gesellschaft mbH, Inspektion+Materialprüfung 
approx. 11,500 m²
Landfill Eggingen, Teil 1
Surface sealing with AGRU liners according to BAM guidelines
and installation of a non-woven protective fabric and bentonite
Building owner: EBU Entsorgungsbetriebe der Stadt Ulm
Construction: Ecosoil Süd GmbH, Ulm
External supervision: Geoplan GmbH, Neukirchen-Vluyn
approx. 43,000 m²
Landfill Wabern DA2, TA4
Basic waterproofing with AGRU liners sowie Verlegung des BAM zugelassenden Schutzsystems: sand filled liners (MDDS-Bahn, Gebr. Friedrich GmbH )
Building owner: DZV Landfillzweckverband Schwalm-Eder-Kreis
Construction:Hermanns HTI-Bau GmbH & Co
External supervision: Büro Dr. Knipschild 
approx. 39,000 m²
Landfill Dyckerhoffbruch BA II-III, Wiesbaden
Basic waterproofing mit CARBOFOL® PEHD 507 naccording to BAM guidelines and installation of a non-woven protective fabric
Building owner: ELW Entsorgungsbetriebe der Landeshauptstadt Wiesbaden
Construction: Walter Heilit Verkehrswegebau
External supervision: Büro Dr. Knipschild  
approx. 30,000 m²
Landfill Callenberg, 3.BA- Surface sealing
Surface sealing mit CARBOFOL® PEHD 507, according to BAM guidelines with drainage layers
Building owner: Zweckverband Abfallwirtschaft Südwestsachsen
Construction:
Strabag AG, Bereich Erd u. Landfillbau Penig, Sachsen
External supervision: DBI-EWI mbH
approx. 35,000 m²
Central landfill Emscherbruch, H5-Bereich
Basic waterproofing with AGRU liners according to BAM guidelines
and installation of a non-woven protective fabric
Building owner: AGR ( Abfallbeseitigunggesellschaft-Ruhrgebiet )
Construction: Arge bds/HUT
External supervision: Limes Gesellschaft mbH, Inspektion+Materialprüfung 
approx. 9,700 m²

Landfills 2004

Project Size
Project Size
Landfill Huckarde, Dortmund
Surface sealing with CARBOFOL® PEHD 406
Building owner: EDG, Entsorgung Dortmund GmbH
Construction: DBR, Dortmund
External supervision: Geotechnisches Büro Prof. Dr. Düllmann 
approx. 39,000 m²
Central landfill Hünxe/ Multi- and Monobereich
Surface sealing with CARBOFOL® PEHD 507 nach
BAM-Richtlinien sowie Verlegung von Schutzvlies
Building owner: AGR ( Abfallbeseitigunggesellschaft—Ruhrgebiet )
Construction: Walter Bau, Borken
External supervision: Limes Gesellschaft mbH, Inspektion+Materialprüfung 
approx. 16,000 m²
Central landfill Emscherbruch, 3.BA- Surface sealing
Surface sealing with AGRU MST/MSB, nach BAM-Richtlinien
Bentonitverlegung, Schutzvliesverlegung, Geogitterverlegung,
teils doppellagige Dichtungsbahn with Kontrollsystem
Building owner: AGR ( Abfallbeseitigunggesellschaft—Ruhrgebiet )
Construction: Arge bds/HUT
External supervision: Limes Gesellschaft mbH, Inspektion+Materialprüfung 
approx. 88,000 m²
Central landfill Emscherbruch, H4—Bereich, 2.BA
Basic waterproofing with AGRU-Dichtungsbahn nach BAM-Richtlinien
sowie Schutzvliesverlegung    
Building owner: AGR ( Abfallbeseitigunggesellschaft—Ruhrgebiet )
Construction: Arge bds/HUT
External supervision: Limes Gesellschaft mbH, Inspektion+Materialprüfung
approx. 12,000 m²
Landfill Bastwald
Surface sealing with AGRU-Dichtungsbahn nach BAM-Richtlinien
sowie Verlegung des BAM zugelassenden Schutzsystems: Sandgefüllte Schutzbahn (MDDS-Bahn, Gebr. Friedrich GmbH )
Building owner: Zweckverband Abfallentsorgungsgesellschaft Vogelsbergkreis
Construction: Kirchner Bauunternehmung
External supervision: Büro Dr. Knipschild
approx. 8,000 m²
Wiedereinbindung Lober-Leine-Kanal
Kanalbasisabdichtung with CARBOFOL® PEHD 406
sowie Verlegung von Schutzvlies
Construction: ARGE Lober-Leine-Kanal
approx. 67,000 m²
Central landfill Mechernich
Surface sealing with CARBOFOL® PEHD 507 nach
BAM-Richtlinien sowie Verlegung von Schutzvlies
Building owner: Kreis Euskirchen
Construction: Sanders Tiefbau
External supervision: Büro Dr. Knipschild
approx. 24,000 m²
Sanierung "Ehemalige Zinkhütte Eppinghofen”
Basic waterproofing with AGRU-Dichtungsbahn nach BAM-Richtlinien
sowie Draingevliesverlegung    
Building owner: City of Mülheim
Construction: Baugesellschaft Wittfeld
External supervision: Limes Gesellschaft mbH, Inspektion+Materialprüfung 
approx. 3,600 m²
Landfill Werl, Los 3
Surface sealing nach BAM-Richtlinien
mit Carbofol® PEHD 507, Verlegung von Drainmatten, PEHD Rohren and Schachtbauwerken
Building owner: ESG GmbH Soest
External supervision: Büro Dr. Knipschild
approx. 9,800 m²

Landfills 2003

Project Size
Project Size
Landfill “Am Kuckuck”, Ratingen
Surface sealing with CARBOFOL® PEHD 507
sowie Verlegung von Drainmatten
Building owner: City of Ratingen
Construction: Bilfinger Berger Umwelt
External supervision: Prüflabor Ruthmann 
approx. 50,000 m²
Landfill ”Knorrbremse”, Wetter/ Ruhr
Surface sealing with CARBOFOL® PEHD 406
sowie Verlegung von Drainmatten
Building owner: LEG Nordrhein-Westfalen
Construction: ARGE Heitkamp GmbH/ BBS Umwelttechnik
External supervision: AGUA GmbH
approx. 34,000 m²
Central landfill Emscherbruch, 2.BA- Surface sealing
Surface sealing with AGRU MST/MSB
sowie Trennvliesverlegung     
Building owner: AGR ( Abfallbeseitigunggesellschaft—Ruhrgebiet )
Construction: Arge bds/HUT
External supervision: Asmus +Prabucki Ingenieure Beratungsgesellschaft
approx. 70,000 m²
Central landfill Emscherbruch, H3 + H4 -Bereich
Basic waterproofing with AGRU-Dichtungsbahn
sowie Schutzvliesverlegung     
Building owner: AGR ( Abfallbeseitigunggesellschaft—Ruhrgebiet )
Construction: Arge bds/HUT
External supervision: Asmus +Prabucki Ingenieure Beratungsgesellschaft
approx. 41,000 m²
Landfill Werl, Los 2
Surface sealing nach BAM-Richtlinien
mit Carbofol® PEHD 507 KN/MK sowie Planumserstellung, Verlegung von Drainmatten, PEHD Rohren and Schachtbauwerken incl. Rekultivierungsschicht
Building owner: ESG GmbH Soest
External supervision: Dr. Knipschild
approx. 10,700 m²
Landfill HOS—Lünen
Surface sealing nach BAM-Richtlinien
mit AGRU-Dichtungsbahnen sowie Planumserstellung, Verlegung von Drainmatten, PEHD Rohren and Schachtbauwerken incl. Rekultivierungsschicht
Building owner: Hüttenwerke Kayser AG
Construction: Heitkamp GmbH
External supervision: Geoplan, Duisburg GmbH
approx. 4,500 m²
Landfill Beselich BA 3+4
Basic waterproofing nach BAM-Richtlinien with CARBOFOL®PEHD 507 KN/MK
Construction: Hermann Kirchner GmbH & Co KG, Bad Hersfeld
External supervision: Büro Dr. Knipschild
approx. 21,000 m²
Ehemaliges Schell-Gelände Monheim
Surface sealing with AGRU-Dichtungsbahn
sowie Drainagemattenverlegung
Building owner: LEG Nordrhein-Westfalen
Construction: Ecosoil Sanierungs GmbH
External supervision: Umtec
approx. 30,000 m²
Landfill Magdeburg
Surface sealing with CARBOFOL® PEHD 507
Building owner: City of Magdeburg
Construction: Strabag
External supervision: Prüflabor Ruthmann, Magdeburg
approx. 14,000 m²

Landfills 2002

Project Size
Project Size
Gleisabdichtung Dortmund Ellinghausen
Basic waterproofing with CARBOFOL® PEHD 507
sowie Schutzvliesverlegung
Building owner: AGR ( Abfallbeseitigungsgesellschaft—Ruhrgebiet )
Construction: ARGE Heitkamp GmbH/ Stricker GmbH
External supervision: Prüflabor Ruthmann  
approx. 22,000 m²
Central landfill Emscherbruch, S-Bereich
Surface sealing with AGRU MST/MSB
sowie Trennvliesverlegung
Building owner: AGR ( Abfallbeseitigunggesellschaft—Ruhrgebiet )
Construction: Arge bds/HUT
External supervision: Asmus+Prabucki Ingenieure Beratungsgesellschaft
approx. 18,500 m²
Central landfill Emscherbruch, 1.BA- Surface sealing
Surface sealing with AGRU MST/MSB
sowie Trennvliesverlegung    
Building owner: AGR ( Abfallbeseitigunggesellschaft—Ruhrgebiet )
Construction: Arge bds/HUT
External supervision: Asmus +Prabucki Ingenieure Beratungsgesellschaft
approx. 70,000 m²
Landfill Dortmund—Nordost Organikfelder 3- 6, Baulos 13.2
Basic waterproofing nach BAM-Richtlinien with CARBOFOL® PEHD 507 Building owner: EDG, Entsorgung Dortmund GmbH
Construction:
F.C. Trapp Tief- and Straßenbau Wesel GmbH
External supervision: Jessberger + Partner
approx. 7,000 m²
Surface sealing Dhünnaue-Nord
Surface sealing nach BAM-Richtlinien
Verlegung with CARBOFOL® PEHD 507
Building owner: Bayer AG, Rheinisches Autobahnamt Köln
Construction: Hochtief AG " Strabag AG ” Hochtief Umwelt GmbH
External supervision: Geotechnisches Büro Prof. Dr. Düllmann
approx. 40,000 m²
Landfill Vereinigte Ville, Abdichtung Stützdamm BA 1, 2, 3
Basic waterproofing nach BAM-Richtlinien with CARBOFOL® PEHD 507
sowie Schutzvliesverlegung
Building owner: Abfallentsorgungs-u. Verwertungsgesellschaft Köln mbH
Construction:
Sanders Tiefbau GmbH & Co KG, Schwalmtal
External supervision: Geotechnisches Büro Prof. Dr. Düllmann
approx. 35,000 m²
Landfill Tummelfeld Abschnitt A
Surface sealing nach BAM-Richtlinien
mit AGRU glatt/glatt, sowie Planumserstellung, Verlegung von Bentonit-matten, Vliesstoffen, PEHD Rohren and Schächten incl. Kiesaufbringung
Building owner: Martinswerke GmbH
External supervision: Geotechnisches Büro Prof. Dr. Düllmann
approx. 45,000 m²
Landfill Greiz
Surface sealing nach BAM-Richtlinien mit
CARBOFOL® PEHD 507 KN/MK
Building owner: AWV Ostthüringen
Construction: TS Bau GmbH, Jena
External supervision: Geoplan GmbH
approx. 40,000 m²
Landfill Werl
Surface sealing nach BAM-Richtlinien
mit Carbofol® PEHD 507 KN/MK sowie Planumserstellung, Verlegung von Drainmatten, PEHD Rohren and Schachtbauwerken incl. Rekultivierungsschicht
Building owner: ESG GmbH Soest
External supervision: Dr. Knipschild
approx. 40,000 m²
Landfill Beselich BA 3+4
Basic waterproofing nach BAM-Richtlinien with CARBOFOL®PEHD 507 KN/MK
Construction: Hermann Kirchner GmbH & Co KG, Bad Hersfeld
External supervision: Büro Dr. Knipschild
approx. 6,000 m²

Landfills 2001

Project Size
Project Size
Central landfill Emscherbruch, Feld 5
Basic waterproofing nach BAM-Richtlinien with CARBOFOL® PEHD 507
sowie Schutzvliesverlegung
Building owner: AGR ( Abfallbeseitigunggesellschaft—Ruhrgebiet )
Construction: Klaus Stewering GmbH & Co. KG
External supervision: Asmus+Prabucki Ingenieure Beratungsgesellschaft  
approx. 20,000 m²
Landfill Dortmund—Nordost Organikfelder 3- 6, Baulos 12.2 + 13.1
Basic waterproofing nach BAM-Richtlinien with CARBOFOL® PEHD 507 Building owner: EDG, Entsorgung Dortmund GmbH
Construction:
F.C. Trapp Tief- and Straßenbau Wesel GmbH
External supervision: Jessberger + Partner
approx. 47,000 m²
Surface sealing Dhünnaue-Nord
Surface sealing nach BAM-Richtlinien
Verlegung with CARBOFOL® PEHD 507
Building owner: Bayer AG, Rheinisches Autobahnamt Köln
Construction: Hochtief AG " Strabag AG ” Hochtief Umwelt GmbH
External supervision: Geotechnisches Büro Prof. Dr. Düllmann
approx. 40,000 m²
Landfill Karlsruhe Grötzingen
Temporäre Surface sealing with CARBOFOL® PEHD 507
sowie Verlegung von Schutzvliesen and Drainmatten
Building owner: Landratsamt Karlsruhe
Planer: ICP Ingenieurgesellschaft, Karlsruhe
Construction: RMU Richard Meyer Bauunternehmung, Sindelfingen
approx. 45,000 m²

Landfills 2000

Project Size
Project Size
Landfill Dortmund—Nordost Organikfelder 3- 6, Baulos 12.2
Basic waterproofing nach BAM-Richtlinien with CARBOFOL® PEHD 507 Building owner: EDG, Entsorgung Dortmund GmbH
Construction:
F.C. Trapp Tief- and Straßenbau Wesel GmbH
External supervision: Jessberger + Partner  
approx. 48,000 m²
Landfill Hilgenberg
Surface sealing with CARBOFOL® PEHD 305/507
sowie Vlies- and Geogitterverlegung
Building owner: Hüls AG
Construction: Heilit Umwelttechnik
Asmus + Prabucki Ingenieure Beratungsgesellschaft
approx. 46,000 m²
Surface sealing Dhünnaue-Mitte
Surface sealing nach BAM-Richtlinien
Verlegung with CARBOFOL® PEHD 507
Building owner: Bayer AG
Construction: Hochtief AG " Strabag AG ” Hochtief Umwelt GmbH
External supervision: Ing. Büro Dr. Steffen 
approx. 28,000 m²
Landfill Dortmund-Grevel, BA V
Surface sealing nach NRW-Richtlinien
Verlegung with CARBOFOL® PEHD 406
Building owner: EDG, Entsorgung Dortmund GmbH
Construction: DBR
External supervision: External supervision: Jessberger + Partner
approx. 8,000 m²
Landfill Emmerich
Surface sealing nach BAM-Richtlinien
Verlegung with CARBOFOL® PEHD 305/ 507 sowie
Verlegung der Flächendrainage with Secudrain®/ Naue
Building owner: Kreis-Kleve-Abfallwirtschaftsgesellschaft mbH
Construction: Heilit Umwelttechnik
External supervision: Geotechnisches Büro Prof. Dr. Düllmann
approx. 63,000 m²

Landfills 1999

Project Size
Project Size
Landfill Dortmund—Nordost Organikfelder 3- 6, Baulos 12.1
Basic waterproofing nach BAM-Richtlinien with CARBOFOL® PEHD 305 Building owner: EDG, Entsorgung Dortmund GmbH
Construction: Fa. Trapp/ Wesel
External supervision: Geotechnisches Büro Prof. Dr.-Ing. Düllmann 
approx. 13,000 m²
Neuordnung Gelände Hüls AG Bottrop—Boy, Baulos 2
Surface sealing with CARBOFOL® PEHD 305
sowie Vlies- and Drainagevliesverlegung
Building owner: Hüls AG
Construction: Hochtief Umwelt
External supervision: HPC—Ingenieurbüro
approx. 35,000 m²
Landfill Hilgenberg
Surface sealing with CARBOFOL® PEHD 305
sowie Vlies- and Geogitterverlegung
Building owner: Hüls AG
Construction: Heilit + Woerner
External supervision: Ing. Büro Dr. Steffen
60,000,00 m²
Landfill Cracauer Anger
Surface sealing with CARBOFOL® PEHD 305
sowie Vliesverlegung
Building owner: City of Magdeburg
Construction: Hochtief Umwelt
External supervision: AGU-TSO " c/o Ruthmann, Magdeburg
approx.135,000 m²
Sonderabfalldeponie Billigheim
Surface sealing with CARBOFOL® PEHD 305
Building owner: SBW Sonderabfallentsorgung Baden-Württemberg
Construction: SBW Sonderabfallentsorgung Baden-Württemberg
External supervision: Büro Dr. Knipschild
approx. 6,000 m²
Landfill Dortmund-Grevel, BA IV  
Surface sealing nach NRW-RichtlinienVerlegung with CARBOFOL® PEHD 406
Building owner: EDG, Entsorgung Dortmund GmbH
Construction: DBR
External supervision: Geotechnisches Büro Prof. Dr. Düllmann
3,000 m²
Landfill Emmerich
Surface sealing nach BAM-Richtlinien
Verlegung with CARBOFOL® PEHD 305/ 507 sowie
Verlegung der Flächendrainage with Secudrain®/ Naue
Building owner: Kreis-Kleve-Abfallwirtschaftsgesellschaft mbH
Construction: Heilit Umwelttechnik
External supervision: Geotechnisches Büro Prof. Dr. Düllmann
approx. 10,000 m²

Landfills 1998

Project Size
Project Size
Landfill Dortmund—Nordost Organikfelder 3- 6, Baulos 12.1
Basic waterproofing nach BAM-Richtlinien with CARBOFOL® PEHD 305 Building owner: EDG, Entsorgung Dortmund GmbH
Construction: Fa. Trapp/ Wesel
External supervision: Geotechnisches Büro Prof. Dr.-Ing. Düllmann 
approx. 7.300 m²
Neuordnung Gelände Hüls AG Bottrop—Boy, Baulos 1
Surface sealing with CARBOFOL® PEHD 305
sowie Vlies- and Drainagevliesverlegung
Building owner: Hüls AG
Construction: Hochtief Umwelt
External supervision: HPC—Ingenieurbüro  
approx. 25,000 m²
Landfill Hilgenberg
Surface sealing with CARBOFOL® PEHD 305
sowie Vlies- and Geogitterverlegung
Building owner: Hüls AG
Construction: Heilit + Woerner
External supervision: Ing. Büro Dr. Steffen  
approx. 40,000 m²
Landfill Dortmund-Grevel, BA IV  
Surface sealing nach NRW-Richtlinien
Verlegung with CARBOFOL® PEHD 406 sowie
Verlegung der Flächendrainage with Secudrain®/ Naue
Building owner: EDG, Entsorgung Dortmund GmbH
Construction: DBR
External supervision: Geotechnisches Büro Prof. Dr. Düllmann
approx. 6.800 m²
Landfill Cracauer Anger
Surface sealing with CARBOFOL® PEHD 305
sowie Vliesverlegung
Building owner: City of Magdeburg
Construction: Papenburg Bauunternehmung
approx. 54,000 m²
Monodeponie Waldering, Rosenheim
Erweiterung der Basic waterproofing nach BAM-Richtlinien
Verlegung with CARBOFOL® PEHD 305
Building owner: City of Rosenheim
Construction: Görlich Bauunternehmung
External supervision: TÜV Bayern
approx. 2.750 m²

Landfills 1997

Project Size
Project Size
Landfill Dortmund—Nordost Organikfelder 3- 6, Baulos 9.1, 2. BA
Basic waterproofing nach BAM-Richtlinien with CARBOFOL® PEHD 305 Building owner: EDG, Entsorgung Dortmund GmbH
Construction: Fa. Trapp/ Wesel
External supervision: Geotechnisches Büro Prof. Dr.-Ing. Düllmann 
approx. 20,000 m²  
Landfill Dortmund—Grevel BA 2b, Fortsetzung aus 1996
Surface sealing according to guidelines of the Federal State of North-Rhine Westphalia with CARBOFOL® CHD
und CARBOFOL® PEHD 406
Building owner: EDG, Entsorgung Dortmund GmbH
Construction: DBR ( Dortmunder Baurecycling GmbH )
External supervision: Büro Dr. Knipschild
approx. 20,000 m²
Landfill Dortmund-Grevel, BA III  
Surface sealing nach NRW-Richtlinien
Verlegung with CARBOFOL® PEHD 406 sowie
Verlegung der Flächendrainage with Secudrain®/ Naue
Building owner: EDG, Entsorgung Dortmund GmbH
Construction: DBR
External supervision: Geotechnisches Büro Prof. Dr. Düllmann
approx. 40,000 m²
Landfill Hünxe Kassetten 4+5+6 ( BA I )
Surface sealing with CARBOFOL® PEHD 305 nach BAM-Richtlinien
Building owner: AGR ( Abfallbeseitigunggesellschaft—Ruhrgebiet )
Construction: Walter—Bau
External supervision: Ingenieurbüro IAB, Krefeld
approx. 8,000 m²
Monodeponie Waldering, Rosenheim
Basic waterproofing nach BAM-Richtlinien
Verlegung with CARBOFOL® PEHD 305
und Leckortungssystem GEOLOGGER/PROGEO
Building owner: City of Rosenheim
Construction: Heilit + Woerner
External supervision: TÜV Bayern
approx.10,000 m²
Lärmschutzwall Duisburg-Hohenbudberg
Altlastsanierung/ Surface sealing  
Verlegung with CARBOFOL® PEHD 305
Building owner: LEG Nordrhein-Westfalen
Construction: Centrans, Bottrop        
External supervision: Ingenieurbüro IAB, Krefeld
approx.12,000 m²
Landfill Hilgenberg
Surface sealing with CARBOFOL® PEHD 305
sowie Vlies- and Geogitterverlegung
Building owner: Hüls AG
Construction: Heilit + Woerner
External supervision: Ing. Büro Dr. Steffen 
approx. 20,000 m²
Landfill Sandmühle
Surface sealing with CARBOFOL® PEHD 305 nach BAM-Richtlinien,
Zwischenabdichtung with Bentonit ( Bentofix® / Naue )
Building owner: Landkreis Wunsiedel
Construction: Heilit + Woerner
External supervision: SKZ ( Süddeutsches Kunststoff-Zentrum )
approx. 35,000 m²
Landfill Weißendorf   
Surface sealing with CARBOFOL® PEHD 305 nach BAM-Richtlinien
Building owner: Landratsamt Greiz
Construction: TBU GmbH, Halle
External supervision: IWT GmbH
approx. 30,000 m²

Landfills 1996

Project Size
Project Size
Landfill Dortmund—Nordost Organikfelder 3- 6, Baulos 9.1
Basic waterproofing nach BAM-Richtlinien with CARBOFOL® PEHD 305 Building owner: EDG, Entsorgung Dortmund GmbH
Construction: Fa. Trapp/ Wesel
External supervision: Geotechnisches Büro Prof. Dr.-Ing. Düllmann 
approx. 27.100 m²
Landfill Dortmund—Grevel BA 2b
Surface sealing according to guidelines of the Federal State of North-Rhine Westphalia with CARBOFOL® CHD
und CARBOFOL® PEHD 406
Building owner: EDG
Construction: DBR ( Dortmunder Baurecycling GmbH )
External supervision: Büro Dr. Knipschild
approx. 39,500 m²
Monodeponie Waldering, Rosenheim
Basic waterproofing nach BAM-Richtlinien
Verlegung with CARBOFOL® PEHD 305
und Leckortungssystem GEOLOGGER/ PROGEO
Building owner: City of Rosenheim
Construction: Heilet & Woerner
External supervision: TÜV Bayern
approx. 4.100 m²
Monodeponie Waldering, Rosenheim
Erweiterung der Basic waterproofing nach BAM-Richtlinien
sowie Surface sealing
Verlegung with CARBOFOL® PEHD 305
Building owner: City of Rosenheim
Construction: Franki—Bau
External supervision: TÜV Bayern
approx. 5.300 m²
Landfill ZEA Iserlohn, Lagerplatz 3
Basic waterproofing nach BAM-Richtlinien,
Verlegung with CARBOFOL® PEHD 305
Building owner: Ruhrverband
Construction: Bauunternehmen Anton Meyer
External supervision: Ingenieurbüro Schicketanz
approx. 7.100 m²
Landfill Hünxe Sondermüllkassette 5
Basis- and Wandabdichtung im Rampenbereich
Building owner: AGR ( Abfallbeseitigunggesellschaft—Ruhrgebiet )
Construction: Walter—Bau
External supervision: Geoplan—Ingenieurbüro
approx. 750 m²
Central landfill Emscherbruch, Schüttbereich C 1, BA 1b
Basic waterproofing nach BAM-Richtlinien
Building owner: AGR—Essen
Construction: Fa. Bergfort
External supervision: Geotechnisches Büro Prof. Dr.-Ing. Düllmann
approx. 4.100 m²
Landfill Viersen DA 7.2
Basic waterproofing nach BAM-Richtlinien
Building owner: City of Viersen
Construction: Fa. Sanders
External supervision: Ingenieurbüro Dr.Steffen
approx. 6.400 m²

Landfills 1995

Project Size
Project Size
Schlammdeponie Grutholz, Castrop-Rauxel
Surface sealing nach BAM- Richtlinien with CARBOFOL® PEHD 305 sowie Vlies- and Drainagemattenverlegung Secudrain® / NaueBuilding owner: City of Castrop—Rauxel
Construction: Bauunternehmung Trapp
External supervision: Geotechnisches Büro Düllmann 
approx. 34,000 m²
Landfill Hilgenberg
Surface sealing with CARBOFOL® PEHD 305
sowie Vlies- and Geogitterverlegung
Building owner: Hüls AG
Construction: Arge Heitkamp/ Trapp
External supervision: Ingenieurbüro Dr. Steffen
approx. 25,000 m²
Landfill Dortmund Grevel BA 1B; 2A
Surface sealing according to guidelines of the Federal State of North-Rhine Westphalia with CARBOFOL® CHD
sowie Schachteindichtung with Bentonit
Building owner: EDG
Construction: DBR ( Dortmunder Baurecycling GmbH )
External supervision: Büro Dr. Knipschild
approx. 25,000 m²
Werksdeponie Chemische Fabrik Kalk, Poller-Landfill, 5. BA Basic waterproofing nach BAM-Richtlinien with CARBOFOL® PEHD 305
Construction: Strabag
External supervision: TÜV-Rheinland
approx. 22,500 m²
Monodeponie Waldering, Rosenheim
Erweiterung der Basic waterproofing nach BAM-Richtlinien;
Verlegung with CARBOFOL® PEHD 305
Building owner: City of Rosenheim
Construction: Hochtief
External supervision: TÜV Bayern
approx. 2,500 m²
Altlastensanierung Scharnhorst
Surface sealing nach BAM-Richtlinien with CARBOFOL® PEHD 305
Building owner: LEG ( Landesentwicklungsgesellschaft NW )
Bauplanung and construction management: Jessberger & Partner
External supervision: Geotechnisches Büro Düllmann
approx. 10.200 m²
Landfill Hünxe Sondermüllkassette 6
Basis- and Wandabdichtung nach BAM-Richtlinien with CARBOFOL® PEHD 305 sowie Schutzvliesverlegung im Wandbereich
Building owner: AGR ( Abfallbeseitigunggesellschaft—Ruhrgebiet )
Construction: Walter—Bau
External supervision: Geoplan—Ingenieurbüro
approx. 12,000 m²
Landfill Hünxe (Sondermüllkassetten 4 + 5)
Surface sealing with CARBOFOL® PEHD 305
Building owner: AGR ( Abfallbeseitigunggesellschaft—Ruhrgebiet )Construction: Walter—Bau
External supervision: Geoplan—Ingenieurbüro
approx. 6000 m²
Landfill Erkrath
Reparaturarbeiten an der Basic waterproofing nach NRW-Richtlinien
mit Carbofol® -CHD S
Building owner: BRW ( Bergisch-Rheinischer-Wasserverband )
Construction: Speeck Bauunternehmen
External supervision: MPA ( Materialprüfungsamt Dortmund )
approx. 1,500 m²

Landfills 1994

Project Size
Project Size
Landfill Dortmund-Nordost, Anorganikfelder 
Basic waterproofing nach BAM-Richtlinien
Building owner: EDG
Construction: Arge Trapp/ Heitkamp
External supervision: Geotechnisches Büro Prof. Dr.-Ing. Düllmann 
73.657 m²
Landfill Dortmund-Nordost, Organikfelder 3-6, Baulos 7
Basic waterproofing nach BAM-Richtlinien
Building owner: EDG
Construction: ArgeTrapp/ Heitkamp
External supervision: Geotechnisches Büro: Prof. Dr.-Ing. Düllmann
22.852 m²
Central landfill Emscherbruch, Schüttbereich C 1, BA 1a
Basic waterproofing nach BAM-Richtlinien
Building owner: AGR—Essen
Construction: Fa. Bergfort
External supervision: Geotechnisches Büro Prof. Dr.-Ing. Düllmann
26.899 m²
Central landfill Hünxe-Kassette 6
Basic waterproofing nach BAM-Richtlinien
Building owner: AGR—Essen
Construction: Fa. Walter Bau GmbH
External supervision: GEOPLAN
6.010 m²
Central landfill Hünxe
Surface sealing nach BAM-Richtlinien
Building owner: AGR—Essen
Construction: Fa. Bergfort     
External supervision: Ingenieurbüro Mackenstein
23.153 m²
Werksdeponie Chemische Fabrik Kalk, Poller-Landfill, 4. BA Basic waterproofing nach BAM-Richtlinien
Construction: Hochtief
External supervision: TÜV-Rheinland
13.075 m²
Werksdeponie Sachtleben Chemie, Halde III, 2. Bauabschnitt Basic waterproofing nach BAM-Richtlinien
Construction: Fa. Maas
External supervision: Dr. -Ing. Steffen—Ingenieurgesellschaft
6.394 m²

Landfills 1993/1994

Project Size
Project Size
Landfill Dortmund-Nordost, Organikfelder 1—3
Basic waterproofing nach BAM-Richtlinien
Building owner: EDG
Construction: Arge Trapp/ Heitkamp
External supervision: Büro Dr. Knipschild/
Geotechnisches Büro: Prof. Dr.-Ing. Düllmann 
97.423 m²
Werksdeponie AIR Lippewerk Lünen
Surface sealing nach NRW-Richtlinien
Construction: Fa. Speeck                                           
External supervision: StUA—Herten 
140,000 m²

Landfills 1990-1993

Project Size
Project Size
Landfill Hünxe, Kassette 5
Basic waterproofing nach BAM-Richtlinien
Building owner: AGR—Essen
Construction: Fa. Bergfort
External supervision: Ingenieurburo Mackenstein 
6,500 m²
Aschedeponie Ville—Hauptfeld
Basic waterproofing nach BAM-Richtlinien
Construction: Rheinbraun AG
External supervision: Büro Dr. Knipschild
55,000 m²
Landfill Viersen II, DA 6.2
Basic waterproofing nach BAM-Richtlinien
Building owner: UTG/ Trienekens, Construction: Fa. Sanders
External supervision: Ingenieurbüro Dr. Steffen
6,500 m²
Landfill Lüdenscheid
Basic waterproofing according to guidelines of the Federal State of North-Rhine Westphalia
Building owner: City of Lüdenscheid, Construction: Fa. Gebr. Schmidt
External supervision: Ingenieurbüro Dr. Steffen
16,500 m²
Landfill CFK-Landfill III. BA
Basic waterproofing nach NRW-Richtlinien
Construction: Fa. Hochtief
External supervision: TÜV-Rheinland
6,500 m²
Landfill Horm III/ Kreis Düren
Basic waterproofing nach BAM-Richtlinien
Building owner: UTG/ Trienekens,
Construction: Fa. Greskowiak
External supervision: Büro Dr. Knipschild/
Geotechnisches Büro: Prof. Dr.-Ing. Düllmann
85,000 m²
Landfill Haus Forst
Basic waterproofing nach BAM-Richtlinien
Building owner: UTG/ Trienekens
Construction: Fa.Sanders
External supervision: Büro Dr. Knipschild
21,000 m²
Landfill Gohr/ Kreis Neuss
Basic waterproofing nach BAM-Richtlinien
Building owner: UTG/ Trienekens
Construction: Fa.Sanders
External supervision: Büro Dr. Knipschild
18,000 m²
Landfill Schlibeck/ Mönchengladbach
Basic waterproofing nach NRW-Richtlinien
Building owner: UTG/ Trienekens
Construction: Fa.Sanders
External supervision: Büro Dr. Knipschild
58,000 m²
Landfill Hattingen II
Basic waterproofing nach BAM-Richtlinien
Building owner: AGR—Essen
Construction: Fa. Walter Bau
External supervision: Geotechnisches Büro Prof. Dr.-Ing. Düllmann
15,000 m²
Landfill Hattingen I
Basic waterproofing nach BAM-Richtlinien
Building owner: AGR—Essen
Construction: Fa. Banse Bau
External supervision: Geotechnisches Büro Prof. Dr.-Ing. Düllmann
20.700 m²
Landfill Dortmund-Grevel
Surface sealing according to guidelines of the Federal State of North-Rhine Westphalia
Building owner: DBR
External supervision: Büro Dr. Knipschild
55,000 m²
Landfill Dortmund—Grevel
Basic waterproofing nach BAM-Richtlinien
Building owner: DBR ,
Construction: Banse Bau GmbH + Co
External supervision: Büro Dr. Knipschild    33,000 m² Landfill Horm II
Basic waterproofing nach BAM-Richtlinien
Building owner: Dürener Landfillgesellschaft
Construction: Fa. Bunte
60,000 m²

Landfills 1986-1989

Project Size
Project Size
Landfill Enka/ Kassel
Basic waterproofing according to guidelines of the Federal State of North-Rhine Westphalia
Building owner and construction management: Akzo Werke 
14,000 m²
Landfill Horm I
Basic waterproofing according to guidelines of the Federal State of North-Rhine Westphalia
Building owner and construction management: Dürener Landfillgesellschaft
15,000 m²
Landfill Wiedehopf
Basic waterproofing according to guidelines of the Federal State of North-Rhine Westphalia
18,000 m²
Landfill Remscheid
Basic waterproofing according to guidelines of the Federal State of North-Rhine Westphalia
Building owner and construction management: City of Remscheid
6,000 m²
Aschedeponie Rheinische Braunkohlenwerke
Basic waterproofing according to guidelines of the Federal State of North-Rhine Westphalia
Building owner and construction management: Rheinbraun AG
External supervision: Büro Dr. Knipschild
72,000 m²
Central landfill Hünxe Kassette 4
Basic waterproofing according to guidelines of the Federal State of North-Rhine Westphalia
Building owner: AGR—Essen 
6,000 m²
Landfill Jedenhofen/ Landkreis Dachau
Basic waterproofing according to guidelines of the Federal State of North-Rhine Westphalia
6,000 m²
Kompostierungsanlage Münster
Basic waterproofing according to guidelines of the Federal State of North-Rhine Westphalia
Building owner and construction management: City of Münster
15,000 m²
Landfill Fröndenberg-Ostbüren
Basic waterproofing according to guidelines of the Federal State of North-Rhine Westphalia
Building owner: AGR- Abfallbeseitigunggesellschaft—Ruhrgebiet
37,000 m²
Werksdeponie Chemische Fabrik Kalk, Poller-Landfill,
Basic waterproofing nach Wasserhaltsgesetz,
Construction: Hochtief, External supervision: TÜV-Rheinland 
7,000 m²
Landfill Bürring/ Salzlager 4
Basic waterproofing according to guidelines of the Federal State of North-Rhine Westphalia
Building owner and construction management: Bayer AG
14,000 m²
Zentaldeponie Wesuwe II/ Landkreis Emsland
Basic waterproofing according to guidelines of the Federal State of North-Rhine Westphalia
7,000 m²
Landfill Eyller Berg
Basic waterproofing according to guidelines of the Federal State of North-Rhine Westphalia
15,000 m²
Aschedeponie Frimmersdorf/ Garzweiler
Basic waterproofing according to guidelines of the Federal State of North-Rhine Westphalia
Building owner and construction management: Rheinische Braunkohlenwerke
120,000 m²
Monodeponie Hamm—Bockum
Basic waterproofing according to guidelines of the Federal State of North-Rhine Westphalia
Building owner and construction management: City of Hamm
21,000qm 
Aschedeponie Frimmersdorf/ Garzweiler
Basic waterproofing according to guidelines of the Federal State of North-Rhine Westphalia
Building owner: Rheinische Braunkohlenwerke, Construction: Rheinbraun
40,000 m²

Landfills bis 1986

Project Size
Project Size
Aschedeponie Frimmersdorf/ Garzweiler
Basic waterproofing according to guidelines of the Federal State of North-Rhine Westphalia
Building owner: Rheinische Braunkohlenwerke
Construction: Rheinbraun
140,000 m²
Landfill St. Augustin
Basic waterproofing according to guidelines of the Federal State of North-Rhine Westphalia
Building owner: Rhein-Sieg-Abfallbeseitigungsgesellschaft
Construction: Fa. Dr. Fink-Stauf
15,000 m²
Landfill St. Augustin
Basic waterproofing according to guidelines of the Federal State of North-Rhine Westphalia
Building owner: Rhein-Sieg-Abfallbeseitigungsgesellschaft
Construction: Fa. Greskowiak
50,000 m²
Landfill Gelsenkirchen ( ehemalige Zeche Consolidation )
Basic waterproofing according to guidelines of the Federal State of North-Rhine Westphalia
Construction: Fa. H. Becker
4,200 m²
Landfill Venneberg
Basic waterproofing according to guidelines of the Federal State of North-Rhine Westphalia
Building owner: Landkreis Emsland
Construction: Fa. Helmus, Lingen
1,300 m²
Landfill Burscheid
Basic waterproofing according to guidelines of the Federal State of North-Rhine Westphalia
Building owner: City of Leverkusen
Construction: Ing.-Büro Christ GmbH
3,700 m²
Landfill Barmen bei Jülich
Basic waterproofing according to guidelines of the Federal State of North-Rhine Westphalia
Building owner: Städtereinigung KG Edelhoff
Construction: Fa. Edelhoff Iserlohn
 
Landfill Lüdenscheid
Basic waterproofing according to guidelines of the Federal State of North-Rhine Westphalia
Building owner: City of Lüdenscheid
 