References
[2007] [2006] [2005] [2004] [2003] [2002] [2001] [2000]
[1999] [1998] [1997] [1996] [1995] [1994] [1993/1994] [1990-1993]
[1986-1989] [until 1986]
Landfills 2007
| Project | Size |
|---|---|
| Project | Size |
|
Landfill Lüntenbeck Wuppertal Landfill capping with CARBOFOL® PEHD 507/508 according to BAM guidelines and installation of drainage layers. Building owner: AWG -Abfallwirtschaftsgesellschaft Construction: Heinrich-Walter Bau, Borken External supervision: S.I.G—Dr.-Ing. Steffen |
approx. 58,000 m² |
|
Central landfill Hünxe—Wandabdichtung Sondermüllkassette Basic waterproofing with CARBOFOL® PEHD 508 according to BAM guidelines and installation of a non-woven protective fabric. Building owner: AGR (Abfallbeseitigunggesellschaft-Ruhrgebiet) Construction: Heilit—Umwelttechnik, Düsseldorf External supervision: Limes Gesellschaft mbH, Inspektion+Materialprüfung |
approx. 1.600 m² |
|
Landfill Eggingen, section 2007 Landfill capping with AGRU liners according to BAM guidelines as well as Bentonit and installation of protective membranes. Building owner: EBU Entsorgungsbetriebe der Stadt Ulm Construction: Ecosoil Süd GmbH, Ulm External supervision: Geoplan GmbH, Neukirchen-Vluyn |
approx. 54,000 m² |
|
Landfill Dänkritz (2006 + 2007) Landfill capping with AGRU liners according to BAM guidelines and installation of drainage layers. Building owner: Zweckverband Abfallwirtschaft Zwickau Construction: Strabag AG, Bereich Erd u. Deponiebau Penig, Sachsen External supervision: DBI-EWI GmbH |
approx. 160,000 m² |
|
Landfill Dortmund-Nordost, contract section 15.3, part 2007 Basic waterproofing with AGRU liners according to BAM guidelines Building owner: EDG, Entsorgung Dortmund GmbH Construction: DBR, Dortmund External supervision: Geotechnisches Büro Prof. Dr. Düllmann |
approx. 15,000 m² |
|
Central landfill Emscherbruch, S—area 2nd construction stage – Landfill capping Landfill capping with CARBOFOL® PEHD 507 according to BAM guidelines and installation of a non-woven protective fabric. Building owner: AGR (Abfallbeseitigunggesellschaft-Ruhrgebiet) Construction: Arge bds/HUT External supervision: Limes Gesellschaft mbH, Inspektion+Materialprüfung |
approx. 29,000 m² |
|
Landfill Fohrde Landfill capping with AGRU liners according to BAM guidelines and installation of drainage layers. Building owner: City of Brandenburg an der Havel Construction: Hermann Kirchner Bauunternehmung External supervision: GGU Gesellschaft für Grundbau und Umwelttechnik |
approx. 63,500 m² |
|
Landfill Lumpicht Landfill capping with CARBOFOL® PEHD 507 according to BAM guidelines and installation of a non-woven protective fabric. Building owner: Zweckverband Abfallwirtschaft Zwickau Construction: Strabag AG, Bereich Erd u. Deponiebau Penig, Sachsen External supervision: DBI-EWI GmbH |
approx. 60,000 m² |
|
Landfill Friedelsheim Landfill capping with CARBOFOL® PEHD 507 according to BAM guidelines and installation of drainage layers. Building owner: Abfallwirtschaft Landkreis Bad Dürkheim Construction: Heilit Umwelttechnik, Darmstadt External supervision: Geotechnisches Büro Prof. Dr. Düllmann |
approx. 6,000 m² |
Landfills 2006
| Project | Size |
|---|---|
| Project | Size |
|
Landfill Dortmund-Nordost, construction stage 15.3, 2006 Basic waterproofing with AGRU liners according to BAM guidelines and installation of a non-woven protective fabric. Building owner: EDG, Entsorgung Dortmund GmbH Construction: DBR, Dortmund External supervision: Geotechnisches Büro Prof. Dr. Düllmann |
approx. 15,000 m² |
|
EZ Gutenfurt/Ravensburg A III Basic waterproofing with AGRU liners according to BAM guidelines and installation of a non-woven protective fabric. Building owner: Landkreis Ravensburg Construction: Ecosoil Süd GmbH, Ulm External supervision: Geoplan GmbH, Neukirchen-Vluyn |
approx. 8,500 m² |
|
Central landfill Emscherbruch, H/S, 3.BA- Surface sealing |
approx. 11,000 m² |
|
Central landfill Emscherbruch, SF 7/8-Bereich Basic waterproofing with AGRU liners according to BAM guidelines and installation of a non-woven protective fabric. Building owner: AGR ( Abfallbeseitigunggesellschaft-Ruhrgebiet ) Construction: Heitkamp Erd-und Strassenbau GmbH External supervision: Limes Gesellschaft mbH, Inspektion+Materialprüfung |
approx. 14,500 m² |
|
Landfill Eggingen, Teilstück 2006 Surface sealing with AGRU liners according to BAM guidelines and installation of a non-woven protective fabric. Building owner: EBU Entsorgungsbetriebe der Stadt Ulm Construction: Ecosoil Süd GmbH, Ulm External supervision: Geoplan GmbH, Neukirchen-Vluyn |
approx. 69,000 m² |
|
Landfill Friedländer Berg Surface sealing with CARBOFOL® PEHD 507 according to BAM guidelines and installation of a non-woven protective fabric and drainage layers. Building owner: Landkreis Oder-Spree Construction: Aricon Straßen-, Tiefbau u. Abriss GmbH External supervision: DBI-EWI GmbH |
approx. 49,000 m² |
|
Landfill Karlsbad/Ittersbach construction stage 2005/2006 Surface sealing mit CARBOFOL® PEHD 507 according to BAM guidelines and installation of a non-woven protective fabric and drainage layers. Building owner: Abfallwirtschaftsbetrieb des Landkreises Karlsruhe Construction: Walter-Heilit Verkehrswegebau External supervision: Geoplan GmbH, Neukirchen-Vluyn |
approx. 95,000 m² |
|
Landfill Einöd, DK II, 1 Basic waterproofing with AGRU liners as well as a protection system approved by BAM: sand filled protective liners (MDDS liners sand mats) Building owner: AWS Abfallwirtschaft Stuttgart Construction: Ecosoil Süd External supervision: MPA Stuttgart |
approx. 20,000 m² |
|
Landfill Neuendorf-Brück Surface sealing mit CARBOFOL® PEHD 507 according to BAM guidelines and installation of drainage layers. Building owner: Abfallwirtschaft Potsdam-Mittelmark GmbH Construction: TS-Bau GmbH External supervision: Limes Gesellschaft mbH, Inspektion+Materialprüfung |
approx. 23,000 m² |
|
Landfill Satte Klamm Surface sealing with AGRU liners according to BAM guidelines. Building owner: Stadt Offenburg Construction: Heilit + Woerner Bau GmbH External supervision: Geoplan GmbH, Neukirchen-Vluyn |
approx. 75,000 m² |
Landfills 2005
| Project | Size |
|---|---|
| Project | Size |
|
Environmental liabilities industrial park Hibernia Surface sealing mit CARBOFOL® PEHD 507 Building owner: LEG Landesentwickelungsgesellschaft NRW Construction: Vestische Straßen- und Tiefbau GmbH, Datteln External supervision: Geotechnisches Büro Prof. Dr. Düllmann |
approx. 24,000 m² |
|
EZ Gutenfurt/Ravensburg Basic waterproofing with AGRU liners according to BAM guidelines Building owner: Landkreis Ravensburg Construction: Ecosoil Süd GmbH, Ulm External supervision: Geoplan GmbH, Neukirchen-Vluyn |
approx. 11,500 m² |
|
Central landfill Emscherbruch, 4.BA- Surface sealing Surface sealing mit CARBOFOL® PEHD 507, according to BAM guidelines Building owner: AGR ( Abfallbeseitigunggesellschaft-Ruhrgebiet ) Construction: Arge bds/HUT External supervision: Limes Gesellschaft mbH, Inspektion+Materialprüfung |
approx. 65,000 m² |
|
Central landfill Emscherbruch, SF6-Bereich Basic waterproofing with AGRU liners according to BAM guidelines and installation of a non-woven protective fabric Building owner: AGR ( Abfallbeseitigunggesellschaft-Ruhrgebiet ) Construction: Heitkamp Erd-und Strassenbau GmbH External supervision: Limes Gesellschaft mbH, Inspektion+Materialprüfung |
approx. 11,500 m² |
|
Landfill Eggingen, Teil 1 Surface sealing with AGRU liners according to BAM guidelines and installation of a non-woven protective fabric and bentonite Building owner: EBU Entsorgungsbetriebe der Stadt Ulm Construction: Ecosoil Süd GmbH, Ulm External supervision: Geoplan GmbH, Neukirchen-Vluyn |
approx. 43,000 m² |
|
Landfill Wabern DA2, TA4 Basic waterproofing with AGRU liners sowie Verlegung des BAM zugelassenden Schutzsystems: sand filled liners (MDDS-Bahn, Gebr. Friedrich GmbH ) Building owner: DZV Landfillzweckverband Schwalm-Eder-Kreis Construction:Hermanns HTI-Bau GmbH & Co External supervision: Büro Dr. Knipschild |
approx. 39,000 m² |
|
Landfill Dyckerhoffbruch BA II-III, Wiesbaden Basic waterproofing mit CARBOFOL® PEHD 507 naccording to BAM guidelines and installation of a non-woven protective fabric Building owner: ELW Entsorgungsbetriebe der Landeshauptstadt Wiesbaden Construction: Walter Heilit Verkehrswegebau External supervision: Büro Dr. Knipschild |
approx. 30,000 m² |
|
Landfill Callenberg, 3.BA- Surface sealing Surface sealing mit CARBOFOL® PEHD 507, according to BAM guidelines with drainage layers Building owner: Zweckverband Abfallwirtschaft Südwestsachsen Construction: Strabag AG, Bereich Erd u. Landfillbau Penig, Sachsen External supervision: DBI-EWI mbH |
approx. 35,000 m² |
|
Central landfill Emscherbruch, H5-Bereich Basic waterproofing with AGRU liners according to BAM guidelines and installation of a non-woven protective fabric Building owner: AGR ( Abfallbeseitigunggesellschaft-Ruhrgebiet ) Construction: Arge bds/HUT External supervision: Limes Gesellschaft mbH, Inspektion+Materialprüfung |
approx. 9,700 m² |
Landfills 2004
| Project | Size |
|---|---|
| Project | Size |
|
Landfill Huckarde, Dortmund Surface sealing with CARBOFOL® PEHD 406 Building owner: EDG, Entsorgung Dortmund GmbH Construction: DBR, Dortmund External supervision: Geotechnisches Büro Prof. Dr. Düllmann |
approx. 39,000 m² |
|
Central landfill Hünxe/ Multi- and Monobereich Surface sealing with CARBOFOL® PEHD 507 nach BAM-Richtlinien sowie Verlegung von Schutzvlies Building owner: AGR ( Abfallbeseitigunggesellschaft—Ruhrgebiet ) Construction: Walter Bau, Borken External supervision: Limes Gesellschaft mbH, Inspektion+Materialprüfung |
approx. 16,000 m² |
|
Central landfill Emscherbruch, 3.BA- Surface sealing Surface sealing with AGRU MST/MSB, nach BAM-Richtlinien Bentonitverlegung, Schutzvliesverlegung, Geogitterverlegung, teils doppellagige Dichtungsbahn with Kontrollsystem Building owner: AGR ( Abfallbeseitigunggesellschaft—Ruhrgebiet ) Construction: Arge bds/HUT External supervision: Limes Gesellschaft mbH, Inspektion+Materialprüfung |
approx. 88,000 m² |
|
Central landfill Emscherbruch, H4—Bereich, 2.BA Basic waterproofing with AGRU-Dichtungsbahn nach BAM-Richtlinien sowie Schutzvliesverlegung Building owner: AGR ( Abfallbeseitigunggesellschaft—Ruhrgebiet ) Construction: Arge bds/HUT External supervision: Limes Gesellschaft mbH, Inspektion+Materialprüfung |
approx. 12,000 m² |
|
Landfill Bastwald Surface sealing with AGRU-Dichtungsbahn nach BAM-Richtlinien sowie Verlegung des BAM zugelassenden Schutzsystems: Sandgefüllte Schutzbahn (MDDS-Bahn, Gebr. Friedrich GmbH ) Building owner: Zweckverband Abfallentsorgungsgesellschaft Vogelsbergkreis Construction: Kirchner Bauunternehmung External supervision: Büro Dr. Knipschild |
approx. 8,000 m² |
|
Wiedereinbindung Lober-Leine-Kanal Kanalbasisabdichtung with CARBOFOL® PEHD 406 sowie Verlegung von Schutzvlies Construction: ARGE Lober-Leine-Kanal |
approx. 67,000 m² |
|
Central landfill Mechernich Surface sealing with CARBOFOL® PEHD 507 nach BAM-Richtlinien sowie Verlegung von Schutzvlies Building owner: Kreis Euskirchen Construction: Sanders Tiefbau External supervision: Büro Dr. Knipschild |
approx. 24,000 m² |
|
Sanierung "Ehemalige Zinkhütte Eppinghofen” Basic waterproofing with AGRU-Dichtungsbahn nach BAM-Richtlinien sowie Draingevliesverlegung Building owner: City of Mülheim Construction: Baugesellschaft Wittfeld External supervision: Limes Gesellschaft mbH, Inspektion+Materialprüfung |
approx. 3,600 m² |
|
Landfill Werl, Los 3 Surface sealing nach BAM-Richtlinien mit Carbofol® PEHD 507, Verlegung von Drainmatten, PEHD Rohren and Schachtbauwerken Building owner: ESG GmbH Soest External supervision: Büro Dr. Knipschild |
approx. 9,800 m² |
Landfills 2003
| Project | Size |
|---|---|
| Project | Size |
|
Landfill “Am Kuckuck”, Ratingen Surface sealing with CARBOFOL® PEHD 507 sowie Verlegung von Drainmatten Building owner: City of Ratingen Construction: Bilfinger Berger Umwelt External supervision: Prüflabor Ruthmann |
approx. 50,000 m² |
|
Landfill ”Knorrbremse”, Wetter/ Ruhr Surface sealing with CARBOFOL® PEHD 406 sowie Verlegung von Drainmatten Building owner: LEG Nordrhein-Westfalen Construction: ARGE Heitkamp GmbH/ BBS Umwelttechnik External supervision: AGUA GmbH |
approx. 34,000 m² |
|
Central landfill Emscherbruch, 2.BA- Surface sealing Surface sealing with AGRU MST/MSB sowie Trennvliesverlegung Building owner: AGR ( Abfallbeseitigunggesellschaft—Ruhrgebiet ) Construction: Arge bds/HUT External supervision: Asmus +Prabucki Ingenieure Beratungsgesellschaft |
approx. 70,000 m² |
|
Central landfill Emscherbruch, H3 + H4 -Bereich Basic waterproofing with AGRU-Dichtungsbahn sowie Schutzvliesverlegung Building owner: AGR ( Abfallbeseitigunggesellschaft—Ruhrgebiet ) Construction: Arge bds/HUT External supervision: Asmus +Prabucki Ingenieure Beratungsgesellschaft |
approx. 41,000 m² |
|
Landfill Werl, Los 2 Surface sealing nach BAM-Richtlinien mit Carbofol® PEHD 507 KN/MK sowie Planumserstellung, Verlegung von Drainmatten, PEHD Rohren and Schachtbauwerken incl. Rekultivierungsschicht Building owner: ESG GmbH Soest External supervision: Dr. Knipschild |
approx. 10,700 m² |
|
Landfill HOS—Lünen Surface sealing nach BAM-Richtlinien mit AGRU-Dichtungsbahnen sowie Planumserstellung, Verlegung von Drainmatten, PEHD Rohren and Schachtbauwerken incl. Rekultivierungsschicht Building owner: Hüttenwerke Kayser AG Construction: Heitkamp GmbH External supervision: Geoplan, Duisburg GmbH |
approx. 4,500 m² |
|
Landfill Beselich BA 3+4 Basic waterproofing nach BAM-Richtlinien with CARBOFOL®PEHD 507 KN/MK Construction: Hermann Kirchner GmbH & Co KG, Bad Hersfeld External supervision: Büro Dr. Knipschild |
approx. 21,000 m² |
|
Ehemaliges Schell-Gelände Monheim Surface sealing with AGRU-Dichtungsbahn sowie Drainagemattenverlegung Building owner: LEG Nordrhein-Westfalen Construction: Ecosoil Sanierungs GmbH External supervision: Umtec |
approx. 30,000 m² |
|
Landfill Magdeburg Surface sealing with CARBOFOL® PEHD 507 Building owner: City of Magdeburg Construction: Strabag External supervision: Prüflabor Ruthmann, Magdeburg |
approx. 14,000 m² |
Landfills 2002
| Project | Size |
|---|---|
| Project | Size |
|
Gleisabdichtung Dortmund Ellinghausen Basic waterproofing with CARBOFOL® PEHD 507 sowie Schutzvliesverlegung Building owner: AGR ( Abfallbeseitigungsgesellschaft—Ruhrgebiet ) Construction: ARGE Heitkamp GmbH/ Stricker GmbH External supervision: Prüflabor Ruthmann |
approx. 22,000 m² |
|
Central landfill Emscherbruch, S-Bereich Surface sealing with AGRU MST/MSB sowie Trennvliesverlegung Building owner: AGR ( Abfallbeseitigunggesellschaft—Ruhrgebiet ) Construction: Arge bds/HUT External supervision: Asmus+Prabucki Ingenieure Beratungsgesellschaft |
approx. 18,500 m² |
|
Central landfill Emscherbruch, 1.BA- Surface sealing Surface sealing with AGRU MST/MSB sowie Trennvliesverlegung Building owner: AGR ( Abfallbeseitigunggesellschaft—Ruhrgebiet ) Construction: Arge bds/HUT External supervision: Asmus +Prabucki Ingenieure Beratungsgesellschaft |
approx. 70,000 m² |
|
Landfill Dortmund—Nordost Organikfelder 3- 6, Baulos 13.2 Basic waterproofing nach BAM-Richtlinien with CARBOFOL® PEHD 507 Building owner: EDG, Entsorgung Dortmund GmbH Construction: F.C. Trapp Tief- and Straßenbau Wesel GmbH External supervision: Jessberger + Partner |
approx. 7,000 m² |
|
Surface sealing Dhünnaue-Nord Surface sealing nach BAM-Richtlinien Verlegung with CARBOFOL® PEHD 507 Building owner: Bayer AG, Rheinisches Autobahnamt Köln Construction: Hochtief AG " Strabag AG ” Hochtief Umwelt GmbH External supervision: Geotechnisches Büro Prof. Dr. Düllmann |
approx. 40,000 m² |
|
Landfill Vereinigte Ville, Abdichtung Stützdamm BA 1, 2, 3 Basic waterproofing nach BAM-Richtlinien with CARBOFOL® PEHD 507 sowie Schutzvliesverlegung Building owner: Abfallentsorgungs-u. Verwertungsgesellschaft Köln mbH Construction: Sanders Tiefbau GmbH & Co KG, Schwalmtal External supervision: Geotechnisches Büro Prof. Dr. Düllmann |
approx. 35,000 m² |
|
Landfill Tummelfeld Abschnitt A Surface sealing nach BAM-Richtlinien mit AGRU glatt/glatt, sowie Planumserstellung, Verlegung von Bentonit-matten, Vliesstoffen, PEHD Rohren and Schächten incl. Kiesaufbringung Building owner: Martinswerke GmbH External supervision: Geotechnisches Büro Prof. Dr. Düllmann |
approx. 45,000 m² |
|
Landfill Greiz Surface sealing nach BAM-Richtlinien mit CARBOFOL® PEHD 507 KN/MK Building owner: AWV Ostthüringen Construction: TS Bau GmbH, Jena External supervision: Geoplan GmbH |
approx. 40,000 m² |
|
Landfill Werl Surface sealing nach BAM-Richtlinien mit Carbofol® PEHD 507 KN/MK sowie Planumserstellung, Verlegung von Drainmatten, PEHD Rohren and Schachtbauwerken incl. Rekultivierungsschicht Building owner: ESG GmbH Soest External supervision: Dr. Knipschild |
approx. 40,000 m² |
|
Landfill Beselich BA 3+4 Basic waterproofing nach BAM-Richtlinien with CARBOFOL®PEHD 507 KN/MK Construction: Hermann Kirchner GmbH & Co KG, Bad Hersfeld External supervision: Büro Dr. Knipschild |
approx. 6,000 m² |
Landfills 2001
| Project | Size |
|---|---|
| Project | Size |
|
Central landfill Emscherbruch, Feld 5 Basic waterproofing nach BAM-Richtlinien with CARBOFOL® PEHD 507 sowie Schutzvliesverlegung Building owner: AGR ( Abfallbeseitigunggesellschaft—Ruhrgebiet ) Construction: Klaus Stewering GmbH & Co. KG External supervision: Asmus+Prabucki Ingenieure Beratungsgesellschaft |
approx. 20,000 m² |
|
Landfill Dortmund—Nordost Organikfelder 3- 6, Baulos 12.2 + 13.1 Basic waterproofing nach BAM-Richtlinien with CARBOFOL® PEHD 507 Building owner: EDG, Entsorgung Dortmund GmbH Construction: F.C. Trapp Tief- and Straßenbau Wesel GmbH External supervision: Jessberger + Partner |
approx. 47,000 m² |
|
Surface sealing Dhünnaue-Nord Surface sealing nach BAM-Richtlinien Verlegung with CARBOFOL® PEHD 507 Building owner: Bayer AG, Rheinisches Autobahnamt Köln Construction: Hochtief AG " Strabag AG ” Hochtief Umwelt GmbH External supervision: Geotechnisches Büro Prof. Dr. Düllmann |
approx. 40,000 m² |
|
Landfill Karlsruhe Grötzingen Temporäre Surface sealing with CARBOFOL® PEHD 507 sowie Verlegung von Schutzvliesen and Drainmatten Building owner: Landratsamt Karlsruhe Planer: ICP Ingenieurgesellschaft, Karlsruhe Construction: RMU Richard Meyer Bauunternehmung, Sindelfingen |
approx. 45,000 m² |
Landfills 2000
| Project | Size |
|---|---|
| Project | Size |
|
Landfill Dortmund—Nordost Organikfelder 3- 6, Baulos 12.2 Basic waterproofing nach BAM-Richtlinien with CARBOFOL® PEHD 507 Building owner: EDG, Entsorgung Dortmund GmbH Construction: F.C. Trapp Tief- and Straßenbau Wesel GmbH External supervision: Jessberger + Partner |
approx. 48,000 m² |
|
Landfill Hilgenberg Surface sealing with CARBOFOL® PEHD 305/507 sowie Vlies- and Geogitterverlegung Building owner: Hüls AG Construction: Heilit Umwelttechnik Asmus + Prabucki Ingenieure Beratungsgesellschaft |
approx. 46,000 m² |
|
Surface sealing Dhünnaue-Mitte Surface sealing nach BAM-Richtlinien Verlegung with CARBOFOL® PEHD 507 Building owner: Bayer AG Construction: Hochtief AG " Strabag AG ” Hochtief Umwelt GmbH External supervision: Ing. Büro Dr. Steffen |
approx. 28,000 m² |
|
Landfill Dortmund-Grevel, BA V Surface sealing nach NRW-Richtlinien Verlegung with CARBOFOL® PEHD 406 Building owner: EDG, Entsorgung Dortmund GmbH Construction: DBR External supervision: External supervision: Jessberger + Partner |
approx. 8,000 m² |
|
Landfill Emmerich Surface sealing nach BAM-Richtlinien Verlegung with CARBOFOL® PEHD 305/ 507 sowie Verlegung der Flächendrainage with Secudrain®/ Naue Building owner: Kreis-Kleve-Abfallwirtschaftsgesellschaft mbH Construction: Heilit Umwelttechnik External supervision: Geotechnisches Büro Prof. Dr. Düllmann |
approx. 63,000 m² |
Landfills 1999
| Project | Size |
|---|---|
| Project | Size |
|
Landfill Dortmund—Nordost Organikfelder 3- 6, Baulos 12.1 Basic waterproofing nach BAM-Richtlinien with CARBOFOL® PEHD 305 Building owner: EDG, Entsorgung Dortmund GmbH Construction: Fa. Trapp/ Wesel External supervision: Geotechnisches Büro Prof. Dr.-Ing. Düllmann |
approx. 13,000 m² |
|
Neuordnung Gelände Hüls AG Bottrop—Boy, Baulos 2 Surface sealing with CARBOFOL® PEHD 305 sowie Vlies- and Drainagevliesverlegung Building owner: Hüls AG Construction: Hochtief Umwelt External supervision: HPC—Ingenieurbüro |
approx. 35,000 m² |
|
Landfill Hilgenberg Surface sealing with CARBOFOL® PEHD 305 sowie Vlies- and Geogitterverlegung Building owner: Hüls AG Construction: Heilit + Woerner External supervision: Ing. Büro Dr. Steffen |
60,000,00 m² |
|
Landfill Cracauer Anger Surface sealing with CARBOFOL® PEHD 305 sowie Vliesverlegung Building owner: City of Magdeburg Construction: Hochtief Umwelt External supervision: AGU-TSO " c/o Ruthmann, Magdeburg |
approx.135,000 m² |
|
Sonderabfalldeponie Billigheim Surface sealing with CARBOFOL® PEHD 305 Building owner: SBW Sonderabfallentsorgung Baden-Württemberg Construction: SBW Sonderabfallentsorgung Baden-Württemberg External supervision: Büro Dr. Knipschild |
approx. 6,000 m² |
|
Landfill Dortmund-Grevel, BA IV Surface sealing nach NRW-RichtlinienVerlegung with CARBOFOL® PEHD 406 Building owner: EDG, Entsorgung Dortmund GmbH Construction: DBR External supervision: Geotechnisches Büro Prof. Dr. Düllmann |
3,000 m² |
|
Landfill Emmerich Surface sealing nach BAM-Richtlinien Verlegung with CARBOFOL® PEHD 305/ 507 sowie Verlegung der Flächendrainage with Secudrain®/ Naue Building owner: Kreis-Kleve-Abfallwirtschaftsgesellschaft mbH Construction: Heilit Umwelttechnik External supervision: Geotechnisches Büro Prof. Dr. Düllmann |
approx. 10,000 m² |
Landfills 1998
| Project | Size |
|---|---|
| Project | Size |
|
Landfill Dortmund—Nordost Organikfelder 3- 6, Baulos 12.1 Basic waterproofing nach BAM-Richtlinien with CARBOFOL® PEHD 305 Building owner: EDG, Entsorgung Dortmund GmbH Construction: Fa. Trapp/ Wesel External supervision: Geotechnisches Büro Prof. Dr.-Ing. Düllmann |
approx. 7.300 m² |
|
Neuordnung Gelände Hüls AG Bottrop—Boy, Baulos 1 Surface sealing with CARBOFOL® PEHD 305 sowie Vlies- and Drainagevliesverlegung Building owner: Hüls AG Construction: Hochtief Umwelt External supervision: HPC—Ingenieurbüro |
approx. 25,000 m² |
|
Landfill Hilgenberg Surface sealing with CARBOFOL® PEHD 305 sowie Vlies- and Geogitterverlegung Building owner: Hüls AG Construction: Heilit + Woerner External supervision: Ing. Büro Dr. Steffen |
approx. 40,000 m² |
|
Landfill Dortmund-Grevel, BA IV Surface sealing nach NRW-Richtlinien Verlegung with CARBOFOL® PEHD 406 sowie Verlegung der Flächendrainage with Secudrain®/ Naue Building owner: EDG, Entsorgung Dortmund GmbH Construction: DBR External supervision: Geotechnisches Büro Prof. Dr. Düllmann |
approx. 6.800 m² |
|
Landfill Cracauer Anger Surface sealing with CARBOFOL® PEHD 305 sowie Vliesverlegung Building owner: City of Magdeburg Construction: Papenburg Bauunternehmung |
approx. 54,000 m² |
|
Monodeponie Waldering, Rosenheim Erweiterung der Basic waterproofing nach BAM-Richtlinien Verlegung with CARBOFOL® PEHD 305 Building owner: City of Rosenheim Construction: Görlich Bauunternehmung External supervision: TÜV Bayern |
approx. 2.750 m² |
Landfills 1997
| Project | Size |
|---|---|
| Project | Size |
|
Landfill Dortmund—Nordost Organikfelder 3- 6, Baulos 9.1, 2. BA Basic waterproofing nach BAM-Richtlinien with CARBOFOL® PEHD 305 Building owner: EDG, Entsorgung Dortmund GmbH Construction: Fa. Trapp/ Wesel External supervision: Geotechnisches Büro Prof. Dr.-Ing. Düllmann |
approx. 20,000 m² |
|
Landfill Dortmund—Grevel BA 2b, Fortsetzung aus 1996 Surface sealing according to guidelines of the Federal State of North-Rhine Westphalia with CARBOFOL® CHD und CARBOFOL® PEHD 406 Building owner: EDG, Entsorgung Dortmund GmbH Construction: DBR ( Dortmunder Baurecycling GmbH ) External supervision: Büro Dr. Knipschild |
approx. 20,000 m² |
|
Landfill Dortmund-Grevel, BA III Surface sealing nach NRW-Richtlinien Verlegung with CARBOFOL® PEHD 406 sowie Verlegung der Flächendrainage with Secudrain®/ Naue Building owner: EDG, Entsorgung Dortmund GmbH Construction: DBR External supervision: Geotechnisches Büro Prof. Dr. Düllmann |
approx. 40,000 m² |
|
Landfill Hünxe Kassetten 4+5+6 ( BA I ) Surface sealing with CARBOFOL® PEHD 305 nach BAM-Richtlinien Building owner: AGR ( Abfallbeseitigunggesellschaft—Ruhrgebiet ) Construction: Walter—Bau External supervision: Ingenieurbüro IAB, Krefeld |
approx. 8,000 m² |
|
Monodeponie Waldering, Rosenheim Basic waterproofing nach BAM-Richtlinien Verlegung with CARBOFOL® PEHD 305 und Leckortungssystem GEOLOGGER/PROGEO Building owner: City of Rosenheim Construction: Heilit + Woerner External supervision: TÜV Bayern |
approx.10,000 m² |
|
Lärmschutzwall Duisburg-Hohenbudberg Altlastsanierung/ Surface sealing Verlegung with CARBOFOL® PEHD 305 Building owner: LEG Nordrhein-Westfalen Construction: Centrans, Bottrop External supervision: Ingenieurbüro IAB, Krefeld |
approx.12,000 m² |
|
Landfill Hilgenberg Surface sealing with CARBOFOL® PEHD 305 sowie Vlies- and Geogitterverlegung Building owner: Hüls AG Construction: Heilit + Woerner External supervision: Ing. Büro Dr. Steffen |
approx. 20,000 m² |
|
Landfill Sandmühle Surface sealing with CARBOFOL® PEHD 305 nach BAM-Richtlinien, Zwischenabdichtung with Bentonit ( Bentofix® / Naue ) Building owner: Landkreis Wunsiedel Construction: Heilit + Woerner External supervision: SKZ ( Süddeutsches Kunststoff-Zentrum ) |
approx. 35,000 m² |
|
Landfill Weißendorf Surface sealing with CARBOFOL® PEHD 305 nach BAM-Richtlinien Building owner: Landratsamt Greiz Construction: TBU GmbH, Halle External supervision: IWT GmbH |
approx. 30,000 m² |
Landfills 1996
| Project | Size |
|---|---|
| Project | Size |
|
Landfill Dortmund—Nordost Organikfelder 3- 6, Baulos 9.1 Basic waterproofing nach BAM-Richtlinien with CARBOFOL® PEHD 305 Building owner: EDG, Entsorgung Dortmund GmbH Construction: Fa. Trapp/ Wesel External supervision: Geotechnisches Büro Prof. Dr.-Ing. Düllmann |
approx. 27.100 m² |
|
Landfill Dortmund—Grevel BA 2b Surface sealing according to guidelines of the Federal State of North-Rhine Westphalia with CARBOFOL® CHD und CARBOFOL® PEHD 406 Building owner: EDG Construction: DBR ( Dortmunder Baurecycling GmbH ) External supervision: Büro Dr. Knipschild |
approx. 39,500 m² |
|
Monodeponie Waldering, Rosenheim Basic waterproofing nach BAM-Richtlinien Verlegung with CARBOFOL® PEHD 305 und Leckortungssystem GEOLOGGER/ PROGEO Building owner: City of Rosenheim Construction: Heilet & Woerner External supervision: TÜV Bayern |
approx. 4.100 m² |
|
Monodeponie Waldering, Rosenheim Erweiterung der Basic waterproofing nach BAM-Richtlinien sowie Surface sealing Verlegung with CARBOFOL® PEHD 305 Building owner: City of Rosenheim Construction: Franki—Bau External supervision: TÜV Bayern |
approx. 5.300 m² |
|
Landfill ZEA Iserlohn, Lagerplatz 3 Basic waterproofing nach BAM-Richtlinien, Verlegung with CARBOFOL® PEHD 305 Building owner: Ruhrverband Construction: Bauunternehmen Anton Meyer External supervision: Ingenieurbüro Schicketanz |
approx. 7.100 m² |
|
Landfill Hünxe Sondermüllkassette 5 Basis- and Wandabdichtung im Rampenbereich Building owner: AGR ( Abfallbeseitigunggesellschaft—Ruhrgebiet ) Construction: Walter—Bau External supervision: Geoplan—Ingenieurbüro |
approx. 750 m² |
|
Central landfill Emscherbruch, Schüttbereich C 1, BA 1b Basic waterproofing nach BAM-Richtlinien Building owner: AGR—Essen Construction: Fa. Bergfort External supervision: Geotechnisches Büro Prof. Dr.-Ing. Düllmann |
approx. 4.100 m² |
|
Landfill Viersen DA 7.2 Basic waterproofing nach BAM-Richtlinien Building owner: City of Viersen Construction: Fa. Sanders External supervision: Ingenieurbüro Dr.Steffen |
approx. 6.400 m² |
Landfills 1995
| Project | Size |
|---|---|
| Project | Size |
|
Schlammdeponie Grutholz, Castrop-Rauxel Surface sealing nach BAM- Richtlinien with CARBOFOL® PEHD 305 sowie Vlies- and Drainagemattenverlegung Secudrain® / NaueBuilding owner: City of Castrop—Rauxel Construction: Bauunternehmung Trapp External supervision: Geotechnisches Büro Düllmann |
approx. 34,000 m² |
|
Landfill Hilgenberg Surface sealing with CARBOFOL® PEHD 305 sowie Vlies- and Geogitterverlegung Building owner: Hüls AG Construction: Arge Heitkamp/ Trapp External supervision: Ingenieurbüro Dr. Steffen |
approx. 25,000 m² |
|
Landfill Dortmund Grevel BA 1B; 2A Surface sealing according to guidelines of the Federal State of North-Rhine Westphalia with CARBOFOL® CHD sowie Schachteindichtung with Bentonit Building owner: EDG Construction: DBR ( Dortmunder Baurecycling GmbH ) External supervision: Büro Dr. Knipschild |
approx. 25,000 m² |
|
Werksdeponie Chemische Fabrik Kalk, Poller-Landfill, 5. BA Basic waterproofing nach BAM-Richtlinien with CARBOFOL® PEHD 305 Construction: Strabag External supervision: TÜV-Rheinland |
approx. 22,500 m² |
|
Monodeponie Waldering, Rosenheim Erweiterung der Basic waterproofing nach BAM-Richtlinien; Verlegung with CARBOFOL® PEHD 305 Building owner: City of Rosenheim Construction: Hochtief External supervision: TÜV Bayern |
approx. 2,500 m² |
|
Altlastensanierung Scharnhorst Surface sealing nach BAM-Richtlinien with CARBOFOL® PEHD 305 Building owner: LEG ( Landesentwicklungsgesellschaft NW ) Bauplanung and construction management: Jessberger & Partner External supervision: Geotechnisches Büro Düllmann |
approx. 10.200 m² |
|
Landfill Hünxe Sondermüllkassette 6 Basis- and Wandabdichtung nach BAM-Richtlinien with CARBOFOL® PEHD 305 sowie Schutzvliesverlegung im Wandbereich Building owner: AGR ( Abfallbeseitigunggesellschaft—Ruhrgebiet ) Construction: Walter—Bau External supervision: Geoplan—Ingenieurbüro |
approx. 12,000 m² |
|
Landfill Hünxe (Sondermüllkassetten 4 + 5) Surface sealing with CARBOFOL® PEHD 305 Building owner: AGR ( Abfallbeseitigunggesellschaft—Ruhrgebiet )Construction: Walter—Bau External supervision: Geoplan—Ingenieurbüro |
approx. 6000 m² |
|
Landfill Erkrath Reparaturarbeiten an der Basic waterproofing nach NRW-Richtlinien mit Carbofol® -CHD S Building owner: BRW ( Bergisch-Rheinischer-Wasserverband ) Construction: Speeck Bauunternehmen External supervision: MPA ( Materialprüfungsamt Dortmund ) |
approx. 1,500 m² |
Landfills 1994
| Project | Size |
|---|---|
| Project | Size |
|
Landfill Dortmund-Nordost, Anorganikfelder Basic waterproofing nach BAM-Richtlinien Building owner: EDG Construction: Arge Trapp/ Heitkamp External supervision: Geotechnisches Büro Prof. Dr.-Ing. Düllmann |
73.657 m² |
|
Landfill Dortmund-Nordost, Organikfelder 3-6, Baulos 7 Basic waterproofing nach BAM-Richtlinien Building owner: EDG Construction: ArgeTrapp/ Heitkamp External supervision: Geotechnisches Büro: Prof. Dr.-Ing. Düllmann |
22.852 m² |
|
Central landfill Emscherbruch, Schüttbereich C 1, BA 1a Basic waterproofing nach BAM-Richtlinien Building owner: AGR—Essen Construction: Fa. Bergfort External supervision: Geotechnisches Büro Prof. Dr.-Ing. Düllmann |
26.899 m² |
|
Central landfill Hünxe-Kassette 6 Basic waterproofing nach BAM-Richtlinien Building owner: AGR—Essen Construction: Fa. Walter Bau GmbH External supervision: GEOPLAN |
6.010 m² |
|
Central landfill Hünxe Surface sealing nach BAM-Richtlinien Building owner: AGR—Essen Construction: Fa. Bergfort External supervision: Ingenieurbüro Mackenstein |
23.153 m² |
|
Werksdeponie Chemische Fabrik Kalk, Poller-Landfill, 4. BA Basic waterproofing nach BAM-Richtlinien Construction: Hochtief External supervision: TÜV-Rheinland |
13.075 m² |
|
Werksdeponie Sachtleben Chemie, Halde III, 2. Bauabschnitt Basic waterproofing nach BAM-Richtlinien Construction: Fa. Maas External supervision: Dr. -Ing. Steffen—Ingenieurgesellschaft |
6.394 m² |
Landfills 1993/1994
| Project | Size |
|---|---|
| Project | Size |
|
Landfill Dortmund-Nordost, Organikfelder 1—3 Basic waterproofing nach BAM-Richtlinien Building owner: EDG Construction: Arge Trapp/ Heitkamp External supervision: Büro Dr. Knipschild/ Geotechnisches Büro: Prof. Dr.-Ing. Düllmann |
97.423 m² |
|
Werksdeponie AIR Lippewerk Lünen Surface sealing nach NRW-Richtlinien Construction: Fa. Speeck External supervision: StUA—Herten |
140,000 m² |
Landfills 1990-1993
| Project | Size |
|---|---|
| Project | Size |
|
Landfill Hünxe, Kassette 5 Basic waterproofing nach BAM-Richtlinien Building owner: AGR—Essen Construction: Fa. Bergfort External supervision: Ingenieurburo Mackenstein |
6,500 m² |
|
Aschedeponie Ville—Hauptfeld Basic waterproofing nach BAM-Richtlinien Construction: Rheinbraun AG External supervision: Büro Dr. Knipschild |
55,000 m² |
|
Landfill Viersen II, DA 6.2 Basic waterproofing nach BAM-Richtlinien Building owner: UTG/ Trienekens, Construction: Fa. Sanders External supervision: Ingenieurbüro Dr. Steffen |
6,500 m² |
|
Landfill Lüdenscheid Basic waterproofing according to guidelines of the Federal State of North-Rhine Westphalia Building owner: City of Lüdenscheid, Construction: Fa. Gebr. Schmidt External supervision: Ingenieurbüro Dr. Steffen |
16,500 m² |
|
Landfill CFK-Landfill III. BA Basic waterproofing nach NRW-Richtlinien Construction: Fa. Hochtief External supervision: TÜV-Rheinland |
6,500 m² |
|
Landfill Horm III/ Kreis Düren Basic waterproofing nach BAM-Richtlinien Building owner: UTG/ Trienekens, Construction: Fa. Greskowiak External supervision: Büro Dr. Knipschild/ Geotechnisches Büro: Prof. Dr.-Ing. Düllmann |
85,000 m² |
|
Landfill Haus Forst Basic waterproofing nach BAM-Richtlinien Building owner: UTG/ Trienekens Construction: Fa.Sanders External supervision: Büro Dr. Knipschild |
21,000 m² |
|
Landfill Gohr/ Kreis Neuss Basic waterproofing nach BAM-Richtlinien Building owner: UTG/ Trienekens Construction: Fa.Sanders External supervision: Büro Dr. Knipschild |
18,000 m² |
|
Landfill Schlibeck/ Mönchengladbach Basic waterproofing nach NRW-Richtlinien Building owner: UTG/ Trienekens Construction: Fa.Sanders External supervision: Büro Dr. Knipschild |
58,000 m² |
|
Landfill Hattingen II Basic waterproofing nach BAM-Richtlinien Building owner: AGR—Essen Construction: Fa. Walter Bau External supervision: Geotechnisches Büro Prof. Dr.-Ing. Düllmann |
15,000 m² |
|
Landfill Hattingen I Basic waterproofing nach BAM-Richtlinien Building owner: AGR—Essen Construction: Fa. Banse Bau External supervision: Geotechnisches Büro Prof. Dr.-Ing. Düllmann |
20.700 m² |
|
Landfill Dortmund-Grevel Surface sealing according to guidelines of the Federal State of North-Rhine Westphalia Building owner: DBR External supervision: Büro Dr. Knipschild |
55,000 m² |
|
Landfill Dortmund—Grevel Basic waterproofing nach BAM-Richtlinien Building owner: DBR , Construction: Banse Bau GmbH + Co External supervision: Büro Dr. Knipschild 33,000 m² Landfill Horm II Basic waterproofing nach BAM-Richtlinien Building owner: Dürener Landfillgesellschaft Construction: Fa. Bunte |
60,000 m² |
Landfills 1986-1989
| Project | Size |
|---|---|
| Project | Size |
|
Landfill Enka/ Kassel Basic waterproofing according to guidelines of the Federal State of North-Rhine Westphalia Building owner and construction management: Akzo Werke |
14,000 m² |
|
Landfill Horm I Basic waterproofing according to guidelines of the Federal State of North-Rhine Westphalia Building owner and construction management: Dürener Landfillgesellschaft |
15,000 m² |
|
Landfill Wiedehopf Basic waterproofing according to guidelines of the Federal State of North-Rhine Westphalia |
18,000 m² |
|
Landfill Remscheid Basic waterproofing according to guidelines of the Federal State of North-Rhine Westphalia Building owner and construction management: City of Remscheid |
6,000 m² |
|
Aschedeponie Rheinische Braunkohlenwerke Basic waterproofing according to guidelines of the Federal State of North-Rhine Westphalia Building owner and construction management: Rheinbraun AG External supervision: Büro Dr. Knipschild |
72,000 m² |
|
Central landfill Hünxe Kassette 4 Basic waterproofing according to guidelines of the Federal State of North-Rhine Westphalia Building owner: AGR—Essen |
6,000 m² |
|
Landfill Jedenhofen/ Landkreis Dachau Basic waterproofing according to guidelines of the Federal State of North-Rhine Westphalia |
6,000 m² |
|
Kompostierungsanlage Münster Basic waterproofing according to guidelines of the Federal State of North-Rhine Westphalia Building owner and construction management: City of Münster |
15,000 m² |
|
Landfill Fröndenberg-Ostbüren Basic waterproofing according to guidelines of the Federal State of North-Rhine Westphalia Building owner: AGR- Abfallbeseitigunggesellschaft—Ruhrgebiet |
37,000 m² |
|
Werksdeponie Chemische Fabrik Kalk, Poller-Landfill, Basic waterproofing nach Wasserhaltsgesetz, Construction: Hochtief, External supervision: TÜV-Rheinland |
7,000 m² |
|
Landfill Bürring/ Salzlager 4 Basic waterproofing according to guidelines of the Federal State of North-Rhine Westphalia Building owner and construction management: Bayer AG |
14,000 m² |
|
Zentaldeponie Wesuwe II/ Landkreis Emsland Basic waterproofing according to guidelines of the Federal State of North-Rhine Westphalia |
7,000 m² |
|
Landfill Eyller Berg Basic waterproofing according to guidelines of the Federal State of North-Rhine Westphalia |
15,000 m² |
|
Aschedeponie Frimmersdorf/ Garzweiler Basic waterproofing according to guidelines of the Federal State of North-Rhine Westphalia Building owner and construction management: Rheinische Braunkohlenwerke |
120,000 m² |
|
Monodeponie Hamm—Bockum Basic waterproofing according to guidelines of the Federal State of North-Rhine Westphalia Building owner and construction management: City of Hamm |
21,000qm |
|
Aschedeponie Frimmersdorf/ Garzweiler Basic waterproofing according to guidelines of the Federal State of North-Rhine Westphalia Building owner: Rheinische Braunkohlenwerke, Construction: Rheinbraun |
40,000 m² |
Landfills bis 1986
| Project | Size |
|---|---|
| Project | Size |
|
Aschedeponie Frimmersdorf/ Garzweiler Basic waterproofing according to guidelines of the Federal State of North-Rhine Westphalia Building owner: Rheinische Braunkohlenwerke Construction: Rheinbraun |
140,000 m² |
|
Landfill St. Augustin Basic waterproofing according to guidelines of the Federal State of North-Rhine Westphalia Building owner: Rhein-Sieg-Abfallbeseitigungsgesellschaft Construction: Fa. Dr. Fink-Stauf |
15,000 m² |
|
Landfill St. Augustin Basic waterproofing according to guidelines of the Federal State of North-Rhine Westphalia Building owner: Rhein-Sieg-Abfallbeseitigungsgesellschaft Construction: Fa. Greskowiak |
50,000 m² |
|
Landfill Gelsenkirchen ( ehemalige Zeche Consolidation ) Basic waterproofing according to guidelines of the Federal State of North-Rhine Westphalia Construction: Fa. H. Becker |
4,200 m² |
|
Landfill Venneberg Basic waterproofing according to guidelines of the Federal State of North-Rhine Westphalia Building owner: Landkreis Emsland Construction: Fa. Helmus, Lingen |
1,300 m² |
|
Landfill Burscheid Basic waterproofing according to guidelines of the Federal State of North-Rhine Westphalia Building owner: City of Leverkusen Construction: Ing.-Büro Christ GmbH |
3,700 m² |
|
Landfill Barmen bei Jülich Basic waterproofing according to guidelines of the Federal State of North-Rhine Westphalia Building owner: Städtereinigung KG Edelhoff Construction: Fa. Edelhoff Iserlohn |
|
|
Landfill Lüdenscheid Basic waterproofing according to guidelines of the Federal State of North-Rhine Westphalia Building owner: City of Lüdenscheid |