References
- Landfills
- Basement and building waterproofing, drip pans
- Underground railways, city railways, motorways, tunnels and drains
- Water Engineering
Landfills 2010
| Project | Size |
|---|---|
| Project | Size |
|
Airport Berlin-Brandenburg-International (BBI, GU II, stage 2010) Soil filter tanks with liner sheets according to BAM guidelines, installation of protective membranes Building owner: Federal state of Brandenburg Construction: ARGE BBI, GUII, Luftseitige Flächenbauwerke External supervision: DWI—EWI -GmbH |
approx. 98.,00 m² |
|
Airport Berlin-Brandenburg-International (BBI, GU XVIII, stage 2010) Soil filter tanks with liner sheets according to BAM guidelines, installation of protective membranes and geogrids Building owner: Federal state of Brandenburg Technical construction: ARGE BBI, GU XVIII, Luftseitige Flächenbauwerke External supervision: DWI—EWI -GmbH |
approx. 34,000 m² |
|
Landfill Karlsruhe West, temporary surface sealing Landfill capping CARBOFOL® PEHD 406, 1,5 mm, MF/MF, installation of protective membranes and wind suction protection Building owner: City of Karlsruhe, administrative office of waste control Construction: Bilfinger Berger Umweltsanierung GmbH |
approx. 25,000 m² |
|
Land restoration sludge lagoons Pluto, area 3, construction stage 2010 Landfill capping with Beco Bentmat CL 1,0, combination of Bentomat and liner sheets, installation of Droptec drainage layers Building owner: Thyssen-Krupp Real Estate GmbH, Essen Construction: Heinrich Becker GmbH, Bottrop External supervision: Geotechnisches Büro Prof. Dr. Düllmann, Büro Herne |
approx. 17,000 m² |
|
Landfill Dortmund-Nordost, contract section 16.1, section 2010 Basic waterproofing according to BAM guidelines (liner sheet 2,5 mm), installation of a protective system accredited by BAM: sand filled protective layers (MDDS sand layers) Building owner: EDG, Entsorgung Dortmund GmbH Construction: DBR, Dortmund External supervision: SIG |
approx. 3,000 m² |
|
Landfill Phönix West, construction stage 2010 Oandfill capping according to BAM guidelines (liner sheet 2,5 mm), installation of drainage layers Building owner: NRW -Urban Construction: DBR, Dortmund External supervision: Geotechnisches Büro Prof. Dr. Düllmann |
approx. 38,000 m² |
|
Landfill Tuningen, construction stage 2010 Landfill capping according to BAM guidelines (liner sheet 2,5 mm), installation of drainage layers Building owner: Abfallwirtschaft Schwarzwald Baar—Kreis Construction: Heilit Umwelttechnik GmbH, Darmstadt External supervision: GGU, Öhringen |
approx. 12,000 m² |
|
Landfill Westerwiehe II, construction stage 2010 Landfill capping according to BAM guidelines (liner sheet 2,5 mm), installation of smectite and drainage layers Building owner: GEG, Gesellschaft zur Entsorgung von Abfällen Kreis Gütersloh mbH Construction: Köster GmbH, Osnabrück External supervision: Limes Gesellschaft mbH, Inspektion+Materialprüfung |
approx. 17,000 m² |
|
Landfill Bestwig Basic waterproofing according to BAM guidelines (liner sheet 2,5 mm), installation of drainage layers Building owner: Mitteldeutsche Hartstein-Industrie GmbH, Winterberg Construction: Bauunternehmung Hilgenroth External supervision: Limes Gesellschaft mbH, Inspektion+Materialprüfung |
approx. 4,000 m² |
|
Surface sealing Hengsteysee, former Treibholzdeponie Landfill capping with Beco Bentmat CL 1,0, combination of Bentomat and liner sheets Building owner: Ruhrverband Construction: Gebrüder Schmidt Bauunternehmung Planung: Ahlenberg Ingenieure GbR, Herdecke |
approx. 7,000 m² |
|
Landfill Werl, construction stage 2010 Landfill capping according to BAM guidelines (liner sheet 2,5 mm), installation of drainage layers Building owner: Wilhelm Düchting GmbH & CO. KG Construction: Wilhelm Düchting GmbH & Co. KG, Hamm External supervision: Siebert + Knipschild GmbH |
approx. 31,000 m² |
|
Landfill Dortmund Huckarde, construction stage 2010 Landfill capping with CARBOFOL® PEHD 406 OIT, glatt, 2,5 mm, installation of drainage layers (Secudrain®) Building owner: Entsorgung Dortmund GmbH Construction: DBR, Dortmunder Baustoffrecycling GmbH External supervision: Geotechnisches Büro Prof. Dr. Düllmann, Büro Herne |
approx. 6,000 m² |
|
Landfill Bornheim-Hersel, construction stage 2010 Landfill capping with CARBOFOL® PEHD 508, glatt, 2,5 mm, BAM, installation of protective layers (Secudrain® and Bentofix B4000) Building owner: City of Bonn Construction: Sanders Tiefbau GmbH, Schwalmtal External supervision: Geotechn. Büro Prof. Dr. Düllmann, Büro Aachen |
approx. 37,000 m² |
|
Landfill Rinderberg-Nattheim Landfill capping with CARBOFOL® PEHD 507, MF/MF, 2,5 mm, BAM, installation of protective (Secutex Bentofix NSP 4900 Laga) Building owner: Kreisabfallwirtschaftsbetrieb, Heidenheim Construction: Ecosoil Süd GmbH, Ulm External supervision: Geoplan GmbH, Neukirchen-Vluyn |
approx. 19,000 m² |
|
Landfill Erwitte, 2nd construction stage Landfill capping with CARBOFOL® PEHD 507, MF/MF, 2,5 mm, BAM, installation of protective and isolating membranes Building owner: Entsorgungswirtschaft Soest GmbH, Soest Construction: Redeker Tiefbau GmbH & Co. KG, Erwitte External supervision: Büro Siebert + Knipschild |
approx. 17,000 m² |
Landfills 2009
| Project | Size |
|---|---|
| Project | Size |
|
Land restoration Graf-Schwerin ½ Landfill capping according to BAM guidelines (liner sheet 2,5 mm) and installation of drainage layers Building owner: RAG Montan Immobilien GMbH Construction: ARGE Heinrich Walter Bau/ Eurovia Teerbau External supervision: Ing.—Büro Dipl.—Ing. Barth, Rheinberg |
approx. 11,000 m² |
|
Landfill Dormagen, landfill capping West Landfill capping CARBOFOL® PEHD 507, MF/MF and installation of protective membranes Building owner: Currenta GmbH & Co. OHG Construction: Suden GmbH, Dorsten External supervision: Limes Gesellschaft mbH, Inspektion+Materialprüfung |
approx. 67,000 m² |
|
Land restoration slurry ponds Pluto, area 3 Landfill capping with Beco Bentmat CL 1,0, combination of Bentomat and liner sheets, installation of Droptec drainage layers Building owner: Thyssen-Krupp Real Estate GmbH, Essen Construction: Heinrich Becker GmbH, Bottrop External supervision: Geotechnisches Büro Prof. Dr. Düllmann, Büro Herne |
approx. 24,000 m² |
|
Landfill Dortmund-Nordost, contract section 16.1, section 2009 Basic waterproofing according to BAM guidelines (liner sheet 2,5 mm), installation of a protective system accredited by BAM: sand filled protective layers (MDDS-Bahn sand layers) Building owner: EDG, Entsorgung Dortmund GmbH Construction: DBR, Dortmund External supervision: SIG (liner sheet 2,5 mm) |
approx. 15,000 m² |
|
Landfill Phönix West, construction stage 2009 Landfill capping according to BAM guidelines (liner sheet 2,5 mm) and installation of drainage layers Building owner: NRW -Urban Construction: DBR, Dortmund External supervision: Geotechnisches Büro Prof. Dr. Düllmann |
approx. 10,000 m² |
|
Airport Berlin-Brandenburg-International (BBI) Land filtration system with liner sheets according to BAM guidelines and installation of protective membranes Building owner: Federal state of Brandenburg Construction: ARGE BBI Luftseitige Flächenbauwerke External supervision: DWI—EWI -GmbH |
approx. 62,000 m² |
|
Landfill Ludwighafen “Hoher Weg”, construction stage 2009 Basic waterproofing according to BAM guidelines (liner sheet 2,5 mm) and installation of a protective system accredited by BAM: sand filled protective layers (MDDS-Bahn sand layers) Building owner: Wirtschaftsbetrieb Ludwighafen Construction: Heilit Umwelttechnik GmbH, Darmstadt External supervision: S.I.G—Dr.-Ing. Steffen |
approx. 21,000 m² |
|
Problem Site ”Kiesgrube” Tenningen Landfill capping according to BAM guidelines (liner sheet 2,5 mm) and installation of protective membranes Building owner: Town of Tenningen Construction: Joos Umwelttechnik GmbH External supervision: MBA, iBMB Braunschweig |
approx. 17,000 m² |
|
Landfill Leverkusen Bürrig Basic- and Landfill capping according to BAM guidelines (liner sheet 2,5 mm), protective membrane, Bentonit Building owner: Currenta GmbH & Co. OHG Construction: Köster AG External supervision: Limes Gesellschaft mbH, Inspektion+Materialprüfung |
approx. 15,000 m² |
|
Central Landfill Hünxe/ batter capping 2nd construction stage Landfill capping with CARBOFOL® PEHD 507 according to BAM guidelines and installation of a protective membranes. Building owner: AGR ( Abfallbeseitigunggesellschaft—Ruhrgebiet ) Construction: Bilfinger + Berger Umwelt, Essen External supervision: Limes Gesellschaft mbH, Inspektion+Materialprüfung |
approx. 14.500 m² |
Landfills 2008
| Project | Size |
|---|---|
| Project | Size |
|
Landfill Heiligenhaus “In der Leibeck” Landfill capping with CARBOFOL® PEHD 507, MF/MF according to BAM guidelines and installation of drainage layers. Building owner: City of Heiligenhaus Construction: Bilfinger + Berger Umwelt, Essen External supervision: Geotechnisches Büro Prof. Dr. Düllmann |
approx. 39,000 m² |
|
Landfill Kamen-Heeren-Werve Landfill capping with AGRU liners, MST+/MSB according to BAM guidelines and installation of a non-woven protective fabric. Building owner: GWA Abfallwirtschaft Kreis Unna Construction: Heitkamp Umwelttechnik GmbH, Herne External supervision: Geotechnisches Büro Prof. Dr. Düllmann |
approx. 88,000 m² |
|
Landfill Dormagen, Basic waterproofing West Basic waterproofing with CARBOFOL® PEHD 507/509 according to BAM guidelines as installation of protective and isolating membranes Building owner: Bayer Industry Services GmbH & Co. OHG Construction: Suden GmbH, Dorsten External supervision: Limes Gesellschaft mbH, Inspektion+Materialprüfung |
approx. 47,000 m² |
|
Landschaftsbauwerk Krupp Boulevard/Krupp Quartier TB Landfill capping with BENTOFIX® NSP 4900 and installation of drainage layers (Secudrain®). Building owner: City of Essen, -Grün + Gruga Essen-, Tiefbauamt Construction: Heinrich Walter Bau GmbH, Borken Planendes Ingenieurbüro: Asmus + Prabucki—Ingenieure mbH, Essen |
approx. 140,000 m² |
|
EZ Gutenfurt/Ravensburg, 3rd construction stage Basic waterproofing with AGRU liners according to BAM guidelines and installation of a non-woven protective fabric and a protection system approved by BAM: sand filled protective liners (MDDS liners sand mats) Building owner: REAG mbH, Ravensburg Construction: Bilfinger + Berger Umwelt, Mannheim External supervision: Geoplan GmbH, Neukirchen-Vluyn |
approx. 5.700 m² |
|
Land restoration slurry ponds Pluto, areas 1 + 2 Landfill capping with Beco Bentmat CL 1,0, a combination of Bentomat (a reinforced geosynthetic clay liner) and liners as well as installation of Droptec drainage layers. Building owner: Thyssen-Krupp Real Estate GmbH, Essen Construction: Heinrich Becker GmbH, Bottrop External supervision: Geotechnisches Büro Prof. Dr. Düllmann, Büro Herne |
approx. 20,000 m² |
|
Landfill Ludwighafen ”Hoher Weg”, construction stage 2008 Landfill capping, with AGRU liners MST+/MSB according to BAM guidelines and installation of drainage layers. Building owner: Wirtschaftsbetrieb Ludwighafen Construction: Heilit Umwelttechnik GmbH, Darmstadt External supervision: S.I.G—Dr.-Ing. Steffen |
approx. 26,000 m² |
|
Landfill SAD Gerolsheim, BF 1—BF 5 |
approx. 55,000 m² |
|
Landfill Olpe "Alte Scheue” Temporäre Landfill capping with CARBOFOL® PEHD 406 according to DVS guidelines Building owner: Kreis Olpe Technische Planung: Ingenieurgruppe Dr. Born—Dr. Ermel External supervision: örtliche Bauleitung |
approx. 54,000 m² |
|
Landfill Heuchelheim-Klingen Landfill capping with CARBOFOL® PEHD 507, MF/MF according to BAM guidelines as well as installation of Bentofix BZ and drainage layers. Building owner: Kreisverwaltung Südliche Weinstraße Construction: Heilit Umwelttechnik, Darmstadt External supervision: Geoplan GmbH, Neukirchen-Vluyn |
approx. 17,000 m² |