Landfills 2017

construction projectdimension
construction projectdimension

Landfill Kaiserslautern 2B, section 2017
Basic capping according to BAM guidelines (liner sheet 2,5 mm), installation of a protective system accredited by BAM: sand filled protective layers (MDDS sand layers)
Building owner: ZAK Kaiserslautern
Technical construction: ARGE Hermanns HTI/ Bickhardt Bau
External supervision: Geoplan GmbH, Neukirchen-Vluyn

approx. 42,000m²
Landfill Wirmsthal, Bermenübergang an Steilwände 2nd section
Basic capping with five layers, overall approx. 9,00m², according to BAM guidelines (liner sheet 2.5 mm), installation of layers of non-woven fabrics, overall approx. 18,000m²
Building owner: Abfallwirtschaftszentrum Wirmsthal
Technical construction: Burger Bau GmbH & Co. KG
External supervision: DBI-EWI GmbH, Blankenburg
approx. 4,500m²

Landfill Reesberg cunstruction phase 3, section 2017
Landfill capping (liner sheet 2.5 mm), installation of betonite fleece and drainage layers
Building owner: Abfallentsorgungsbetrieb Kreis Herford
Technical construction: STRABAG Umwelttechnik GmbH, Südwest
External supervision: Limes Gesellschaft mbH, Inspektion + Materialprüfung

approx. 45,200m²
Urban waste landfill Wittenberge phase 4, section 2017
Basic capping according to BAM guidelines (liner sheet 2,5 mm), installation of betonite fleece (LAGA) and protective layers of non-woven fabrics
Building owner: Immoblilienverwaltungsbetrieb Landkreis Prignitz
Technical construction:OTTO DÖRNER Kies u. Umwelt Mecklenburg GmbH&Co. KG
External supervision: GGU, Sülztetal/Osterweddingen
approx. 32,000m²
Mineral landfill Erftstadt Erp, phase 5
Basic sealing and extension of basic capping according to BAM guidelines (liner sheet 2,5 mm), installation of protective layers of non-woven fabrics
Building owner: Rhiem & Sohn Kies und Sand GmbH & Co. KG
Technical construction: Sanders Tiefbau GmbH & Co. KG
External supervision: Geotechnisches Büro Prof. Dr. Düllmann
approx. 11,000m²
Reconstruction former cokery Hassel, Gelsenkirchen
Basic capping according to BAM guidelines (liner sheet 2,5 mm) and installation of drainage layers
Building owner: RAG Montan Immobilien GmbH
Technical construction: Ecosoil Nord-West GmbH
External supervision: Dipl.-Ing. Gregor Barth Ingenieurbüro für Baugrund- Geo- und Umwelttechnik
approx. 18,000m²
Reconstruction former cokery Graf -Bismarck, Gelsenkirchen
Basic capping according to BAM guidelines (liner sheet 2,5 mm) and installation of drainage layers
Building owner: RAG Montan Immobilien GmbH
Technical construction: Ecosoil Nord-West GmbH
External supervision: Dipl.-Ing. Gregor Barth Ingenieurbüro für Baugrund- Geo- und Umwelttechnik
approx. 46,475m²
Landfill Halle Künsebeck phase 2B, section 2017
Basic capping according to BAM guidelines (liner sheet 2,5 mm), installation of betonite fleece, drainage layers and protective layers of non-woven fabrics
Building owner: Gesellschaft zur Entsorgung Abfällen Kreis Gütersloh mbH
Technical construction: Suden GmbH, Dorsten
External supervision: Limes Gesellschaft mbH, Inspektion+Materialprüfung
approx. 29,000m²
Airport BER (extension undergravel filter BF 2b)
Undergravel filter basin according to BAM guidelines, protective layers of non-woven fabrics binding to concrete profile
Building owner: Land Brandenburg
Technical construction: J. Bunte Bauunternehmung GmbH & Co. KG
External supervision: DWI - EWI -GmbH
approx. 3,000m²
Landfill Hubbelrath , 2nd northern expansion, 7th construction stage
Midway capping according to BAM guidelines (liner sheet 2,5 mm) and protective layers of non-woven fabrics
Building owner: Zentraldeponie Hubbelrath GmbH
Technical construction: Suden GmbH
External supervision: Geotechnisches Büro Prof. Dr. Düllmann
approx. 5,000m²

Landfills 2016

construction projectdimension
construction projectdimension
Landfill Ludwigshafen Los 1, surface sealing 2nd construction stage
Basic capping according to BAM guidelines (liner sheet 2,5 mm) installation of drainage layers and protective layers of non-woven fabrics
Building owner: Stadt Ludwigshafen
Technical construction: STRABAG Umwelttechnik GmbH, Südwest
External supervision: S.I.G. - DR.-ING. STEFFEN GmbH
approx. 21,000m²
Landfill Kaiserslautern phase 2B, construction stage 2016
Basic capping according to BAM guidelines (liner sheet 2,5 mm) and installation of a protective system according to BAM guidelines: sand filled protective layers (MDDS sand layers)
Building owner: ZAK Kaiserslautern
Technical construction: ARGE Hermanns HTI/ Bickhardt Bau
FExternal supervision: Geoplan GmbH, Neukirchen-Vluyn
approx. 18,000m²
Landfill Tummelfeld construction stage F2
Surface capping according to BAM guidelines (liner sheet 2,5 mm), installation of betonite fleece and protective layers of non-woven fabrics, PE-HD pipes and shafts including gravel covering
Building owner: Martinswerke GmbH
External supervision: Geotechnisches Büro Prof. Dr. Düllmann
approx. 13,800m²
Landfill Reesberg phase 3, section 2016
Surface capping according to BAM guidelines (liner sheet 2,5 mm), installation of drainage layers
Building owner: Abfallentsorgungsbetrieb Kreis Herford
Technical construction: STRABAG Umwelttechnik GmbH, Südwest
External supervision: Limes Gesellschaft mbH, Inspektion + Materialprüfung
approx. 79,800m²
Urban waste landfill Wittenberge construction stage 4, section 2016
Surface capping according to BAM guidelines (liner sheet 2,5 mm) installation of betonite fleece and protective layers of non-woven fabrics
Building owner: Immoblilienverwaltungsbetrieb Landkreis Prignitz
Technical construction: OTTO DÖRNER Kies und Umwelt Mecklenburg GmbH & Co. KG
External supervision: GGU, Sülztetal/Osterweddingen
approx. 35,000m²
Landfill Immigrath 2nd conctruction stage
Surface capping according to BAM guidelines (liner sheet 2,5 mm) installation of betonite fleece, protective layers of non-woven fabrics and geogrid
Building owner: Abfallgesellschaft Kreis Mettmann mbH
Technical construction: SandersTiefbau GmbH & Co. KG
External supervision: Geotechnisches Büro Prof. Dr. Düllmann
approx. 18,000m²
Landfill Halle Künsebeck construction stage 2B
Surface capping according to BAM guidelines (liner sheet 2,5 mm) installation of betonite fleece, protective layers of non-woven fabrics and drainage layers
Building owner: Gesellschaft zur Entsorgung Abfällen Kreis Gütersloh mbH
Technical construction: Suden GmbH, Dorsten
External supervision: Limes Gesellschaft mbH, Inspektion+Materialprüfung
approx. 31,000m²
Landfill for construction and asbestic waste Menningen VA 3.1
Basic capping according to BAM guidelines (liner sheet 2,5 mm), installation of protective layers of non-woven fabrics
Building owner: BRS GmbH Sigmaringen
Technical construction: Kovacic Ingenieure GmbH
External supervision: GGU, Öhringen
approx. 4,500m²
Landfill Sinsheim OFA construction stage 2016
Landfill capping according to BAM guidelines (liner sheet 2,5 mm) installation of betonite fleece and drainage layers
Building owner: AVR Kommunal GmbH, Sinsheim
Technical construction: Geiger Umweltsanierung, Oberstdorf
External supervision: Geoplan GmbH, Neukirchen-Vluyn
approx. 23,000m²
Landfill Tuningen, construction stage 2016
Surface capping according to BAM guidelines (liner sheet 2,5 mm), installation of drainage layers
Building owner: Abfallwirtschaft Schwarzwald Baar - Kreis
Technical construction: STRABAG Umwelttechnik GmbH
External supervision: GGU, Öhringen
approx. 18,300m²

Landfills 2015

construction projectdimension
construction projectdimension
Central landfill Emscherbruch SF 9.2- SF 11.2
Basic capping according to BAM guidelines (liner sheet 2.5 mm) as well as installation of drainage layers
Building owner: AGR mbH, Herten
Technical construction: ARGE Marsch Straßenbau-Tiefbau/DBR
External supervision: Limes Gesellschaft mbH, Inspektion+Materialprüfung
approx. 12.500m²
Landfill Kaiserslautern construction stages 1 A+B
Basic capping according to BAM guidelines (liner sheet 2.5 mm), installation of a protective system accredited by BAM: sand filled protective layers (MDDS sand layers)
Building owner: ZAK Kaiserslautern
Technical construction: ARGE Hermanns HTI/ Bickhardt Bau
External supervision: Geoplan GmbH, Neukirchen-Vluyn
approx. 52.500m²
Landfill Kaiserslautern, Oberflächenerweiterung
Landfill capping according to BAM guidelines (liner sheet 2.5 mm), installation of betonite fleece, drainage layers and geogrids
Building owner: ZAK Kaiserslautern
Technical construction: ARGE Hermanns HTI/ Bickhardt Bau
External supervision: Geoplan GmbH, Neukirchen-Vluyn
approx. 17,800m²
Landfill Reesberg Bauphase 3rd section 2015
Landfill capping (liner sheet 2.5 mm), installation of betonite fleece and drainage layers
Building owner: Abfallentsorgungsbetrieb Kreis Herford
Technical construction: STRABAG Umwelttechnik GmbH, Südwest
External supervision: Limes Gesellschaft mbH, Inspektion + Materialprüfung
approx. 40,000m²
Landfill Schwarndorf, laying in landfill Westböschung
Landfill capping according to BAM guidelines (liner sheet 2.5 mm), installation of betonite fleece and drainage layers
Building owner: Zweckverband Müllverwertung Schwandorf
Technical construction: : ARGE Hermanns HTI/ Bickhardt Bau
External supervision: S.I.G. - DR.-ING. STEFFEN GmbH
approx. 27,000m²
Landfill Wirmsthal, Bermenübergang an Steilwände
Basic capping with five layers, overall approx. 7,900m², according to BAM guidelines (liner sheet 2.5 mm), installation of layers of non-woven fabrics, overall approx. 11,900m²
Building owner: Abfallwirtschaftszentrum Wirmsthal
Technical construction: Burger Bau GmbH & Co. KG
External supervision: DBI-EWI GmbH, Blankenburg
approx. 2,600m²
Landfill Halle Künsebeck
Landfill capping according to BAM guidelines (liner sheet 2.5 mm), installation of betonite fleece, drainage layers and protective membranes
Building owner: Gesellschaft zur Entsorgung Abfällen Kreis Gütersloh mbH
Technical construction: Suden GmbH, Dorsten
External supervision: Limes Gesellschaft mbH, Inspektion+Materialprüfung
approx. 23,000m²
Landfill Dormagen, Teilfläche 3.BA
Landfill capping according to BAM guidelines (liner sheet 2.5 mm),
Building owner: Currenta
Technical construction: Köster GmbH, Osnabrück
External supervision: Ingenieurbüro Siebert + Knipschild GmbH
approx. 19,000m²
Landfill Hünxe, Kassete 1, Zwischenabdichtung
Capping according to BAM guidelines (liner sheet 2.5 mm) as well as installation of drainage layers
Building owner: AGR mbH, Herten
Technical construction: STRABAG Umwelttechnik GmbH
External supervision: Limes Gesellschaft mbH, Inspektion+Materialprüfung
approx. 6,200m²
Landfill Tuningen, Teilabschnitt 2015
Landfill capping according to BAM guidelines (liner sheet 2.5 mm), installation of drainage layers
Building owner: Abfallwirtschaft Schwarzwald Baar - Kreis
Technical construction: STRABAG Umwelttechnik GmbH
External supervision: GGU, Öhringen
approx. 19,000m²

Landfills 2014

construction projectdimension
construction projectdimension
Central residue landfill Hochsauerlandkreis, Meschede
Basic capping, construction stage 3, 2nd section, according to BAM guidelines (liner sheet 2.5 mm) as well as installation of drainage layers
Building owner: Gesellschaft für Abfallwirtschaft Hochsauerland mbH
Technical construction: ARGE Marsch Straßenbau-Tiefbau/DBR
External supervision: Limes Gesellschaft mbH, Inspektion+Materialprüfung
approx. 12,000m²
Environmental remediation new construction helicopter rescue station Cologne-Kalk
Landfill capping according to BAM guidelines (liner sheet 2.5 mm), installation of drainage layers and geogrids
Building owner: City of Cologne
Technical construction: Dr. Fink Stauf GmbH & Co. KG
approx. 9,000m²
Landfill Emscherbruch S-Bereich, 3rd construction stage
Landfill capping according to BAM guidelines (liner sheet 2.5 mm)
Building owner: AGR mbH, Herten
Technical construction: Heilit Umwelttechnik GmbH,Bereich Düsseldorf
External supervision: Limes Gesellschaft mbH, Inspektion + Materialprüfung
approx. 27,000m²
Landfill Reesberg, construction stage 1a
Basic capping according to BAM guidelines (liner sheet 2.5 mm), installation of a protective system accredited by BAM: sand filled protective layers (MDDS sand layers)
Technical construction: STRABAG Umwelttechnik GmbH, Südwest
External supervision: Limes Gesellschaft mbH, Inspektion + Materialprüfung
approx. 33,000m²
Landfill Kuhstedt
Landfill capping according to BAM guidelines (liner sheet 2.5 mm) as well as installation of drainage layers
Building owner: Landkreis Rothenburg (Wümme), Abfallwirtschaftsbetrieb
Technical construction: STRABAG Umwelttechnik GmbH, Nordost
External supervision: Ingenieurbüro Siebert + Knipschild
approx. 32,000m²
Landfill Tummelfeld construction stage F1
Landfill capping according to BAM guidelines (liner sheet 2.5 mm) as well es planning, installation of betonite, fleece, PEHD pipes and drains including surface sealing with gravel
Building owner: Martinswerke GmbH
External supervision: Geotechnisches Büro Prof. Dr. Düllmann
approx. 11,200m²
Landfill Wehrden – Beverungen,  1st construction stage
Basic capping according to BAM guidelines (liner sheet 2.5 mm), installation of a protective system accredited by BAM: sand filled protective layers (MDDS sand layers)
Building owner: Kreis Höxter, Der Landrat
Technical construction: Hermanns HTI-Bau GmbH & Co. KG
External supervision: Limes Gesellschaft mbH, Inspektion+Materialprüfung
approx. 10,200m²
Landfill Dortmund-Nordost, construction stage 16.4, section 2013-2014
Basic capping according to BAM guidelines (liner sheet 2.5 mm), installation of a protective system accredited by BAM: sand filled protective layers (MDDS sand layers)
Building owner: EDG, Entsorgung Dortmund GmbH
Technical construction: DBR, Dortmund
External supervision: Geotechnisches Büro Prof. Dr. Düllmann, Büro Herne
approx. 14,300m²
Landfill Solvay, section 2014
Basic capping according to BAM guidelines (liner sheet 2,5 mm), installation of a protective system accredited by BAM: sand filled protective layers (MDDS sand layers)
Building owner: Solvay Chemicals GmbH
Technical construction: AVG Bau Goch GmbH
External supervision: Geotechnisches Büro Prof. Dr. Düllmann
approx. 17,000m²